tm logo
YULONG
Dead/Abandoned
ABANDONED - FAILURE TO RESPOND OR LATE RESPONSE

failure to respond or late response

on 01 Apr 2024

Last Applicant/ Owned by

National environmental Protection Technology Industrial Park, Xinjie Street, Yixing City 214000 Jiangsu Province

CN

Serial Number

79356695 filed on 31st Oct 2022

Registration Number

N/A

Correspondent Address

No. 801 Hongqiao Road,

Jiangsu Province,

CHINA

Filing Basis

1. filing basis filed as 66 a

Disclaimer

NO DATA

YULONG

Steel pipes; metal, wash down spray nozzles for commercial and industrial use; metal junction sleeves for non-electric cables; valves of metal, other than parts of machines; steel, unwrought or semi-wrought; cast steel; sheet metal [not of precious metal]; steel formworks; metal flanges; foundry chill-molds

Classification Information


Class [006]
Metal Products


Steel pipes; metal, wash down spray nozzles for commercial and industrial use; metal junction sleeves for non-electric cables; valves of metal, other than parts of machines; steel, unwrought or semi-wrought; cast steel; sheet metal [not of precious metal]; steel formworks; metal flanges; foundry chill-molds


First Use Date in General

N/A

First Use Date in Commerce

N/A

Mark Details


Serial Number

No 79356695

Mark Type

No Service/Collective Mark

Attorney Docket Number

No

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

Yes

66A Current

Yes

Current Basis

No

No Basis

No

Design Code(s)

26.13.14 -

Three or more quadrilaterals

26.13.16 -

Quadrilaterals touching or intersecting

26.13.21 -

Quadrilaterals that are completely or partially shaded

Legal History


Show more

Status DateAction Taken
01st May 2024NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
01st May 2024NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
01st Apr 2024ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
01st Apr 2024ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
25th Sep 2023REFUSAL PROCESSED BY IB
05th Sep 2023NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
05th Sep 2023REFUSAL PROCESSED BY MPU
16th Aug 2023NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
15th Aug 2023NON-FINAL ACTION WRITTEN
15th Aug 2023ASSIGNED TO EXAMINER