tm logo
YEED BUILD THE NEXT STEP
Live/Pending
NON-FINAL ACTION - MAILED

final action

on 13 Jun 2024

Last Applicant/ Owned by

F-59280 Armentières

FR

Serial Number

79383101 filed on 20th Sep 2023

Registration Number

N/A

Correspondent Address

2ème étage

F-33000 Bordeaux,

FRANCE

Filing Basis

1. filing basis filed as 66 a

Disclaimer

NO DATA

YEED BUILD THE NEXT STEP

Construction; construction consultancy; information with respect to construction; building construction supervision; site preparation [earth moving]; repair and maintenance of earth moving equipment Non-metallic construction materials; non-metallic rigid pipes for building; transportable buildings not of metal; carriers in the form of non-metallic structures; monuments not of metal

Classification Information


Class [037]
Construction and Repair Services


Construction; construction consultancy; information with respect to construction; building construction supervision; site preparation [earth moving]; repair and maintenance of earth moving equipment


First Use Date in General

N/A

First Use Date in Commerce

N/A

Class [019]
Non-Metallic Building Material Products


Non-metallic construction materials; non-metallic rigid pipes for building; transportable buildings not of metal; carriers in the form of non-metallic structures; monuments not of metal


First Use Date in General

N/A

First Use Date in Commerce

N/A

Mark Details


Serial Number

No 79383101

Mark Type

No Service Mark

Attorney Docket Number

No

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

Yes

66A Current

Yes

Current Basis

No

No Basis

No

Design Code(s)

03.03.03 -

Hippopotami, rhinoceri

03.03.16 -

Heads of elephants, hippopotami, rhinoceri, giraffes, alpacas, camels and llamas

03.03.24 -

Stylized elephants, hippopotami, rhinoceri, giraffes, alpacas, camels and llamas

26.09.01 -

Squares as carriers or squares as single or multiple line borders

Legal History


Status DateAction Taken
01st Jul 2024REFUSAL PROCESSED BY IB
13th Jun 2024REFUSAL PROCESSED BY MPU
13th Jun 2024NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
05th Jun 2024NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
20th May 2024NON-FINAL ACTION WRITTEN
14th May 2024ASSIGNED TO EXAMINER
21st Nov 2023APPLICATION FILING RECEIPT MAILED
17th Nov 2023NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
16th Nov 2023SN ASSIGNED FOR SECT 66A APPL FROM IB