on 16 Nov 2021
Last Applicant/ Owned by
Fangqiao Industry Zone, Jiangkou Subdist
CN
Serial Number
79311155 filed on 15th Jun 2020
Registration Number
6557616 registered on 16th Nov 2021
Filing Basis
No Filing Basis
Disclaimer
NO DATA
Electromagnetic coils; aerometers; pressure gauges; electricity wire connectors; electromagnetic switches, namely, solenoid valves; voltage stabilizing power supply; components for electrical mains in the nature of electric wires and cables; junction boxes; coils, electric; printed circuits; solenoid valves Hydraulic pressure coupler being machine parts; hydraulic torque converter being machine c Read More
Hydraulic pressure coupler being machine parts; hydraulic torque converter being machine components other than for land vehicles; hydraulic pump; pneumatic transporters; air suction machines for industrial purposes; hydraulic intensifier being parts of machines; valves being parts of machines; pressure valves being parts of machines; electric door opener
Electromagnetic coils; aerometers; pressure gauges; electricity wire connectors; electromagnetic switches, namely, solenoid valves; voltage stabilizing power supply; components for electrical mains in the nature of electric wires and cables; junction boxes; coils, electric; printed circuits; solenoid valves
No 79311155
No Service/Collective Mark
No
No
No
No
No
No
No
No
No
01.01.02 -
A single star with four points
26.17.09 -
Curved line(s), band(s) or bar(s)
26.17.12 -
Chevrons and angles
27.01.04 -
Letters or numerals, including punctuation, forming representations of objects, parts of objects, or maps
27.03.01 -
Geometric figures forming letters or numerals, including punctuation
27.03.05 -
Representations of objects forming letters or numerals, including punctuation
Status Date | Action Taken |
---|---|
30th May 2022 | FINAL DECISION TRANSACTION PROCESSED BY IB |
09th May 2022 | FINAL DISPOSITION NOTICE SENT TO IB |
09th May 2022 | FINAL DISPOSITION PROCESSED |
16th Feb 2022 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
16th Nov 2021 | REGISTERED-PRINCIPAL REGISTER |
31st Aug 2021 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
31st Aug 2021 | PUBLISHED FOR OPPOSITION |
29th Aug 2021 | NOTIFICATION PROCESSED BY IB |
11th Aug 2021 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
11th Aug 2021 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |