no statement of use filed
on 30 Aug 2021
Last Applicant/ Owned by
No.1280, Shuying Road, Minhang District
Shanghai
CN
201199
Serial Number
88540224 filed on 26th Jul 2019
Registration Number
N/A
Filing Basis
1. intent to use
2. intent to use current
Disclaimer
NO DATA
LED and HID light fixtures; LED candles; LED flashlights; LED lamps; LED landscape lights; LED light engines; LED lighting systems, namely, LED modules, power supplies, and wiring; LED luminaires; LED underwater lights; Light bulbs; Light reflectors; Lighting apparatus for sports arenas; Lighting apparatus for vehicles; Lighting fixtures; Lighting installations; Lighting installations for air vehi Read More
LED and HID light fixtures; LED candles; LED flashlights; LED lamps; LED landscape lights; LED light engines; LED lighting systems, namely, LED modules, power supplies, and wiring; LED luminaires; LED underwater lights; Light bulbs; Light reflectors; Lighting apparatus for sports arenas; Lighting apparatus for vehicles; Lighting fixtures; Lighting installations; Lighting installations for air vehicles; Lighting installations for vehicles; Lighting tracks; Lighting tubes; Ceiling light fittings; Ceiling lights; Diving lights; Electric torches for lighting; Fluorescent lighting tubes; Infrared lighting fixtures; Landscape lighting installations; Lanterns for lighting; Laser light projectors; LED light bulbs; LED light machines; Luminaires, using light emitting diodes (LEDs) as a light source, for street or roadway lighting; Miniature light bulbs; Outdoor lighting, namely, paver lights; Reading lights; Spot lights; Strip lighting for indoor use; Wall lights
No 88540224
No Service/Collective Mark
No 187938
No
No
No
No
No
No
No
No
Status Date | Action Taken |
---|---|
30th Aug 2021 | ABANDONMENT - NO USE STATEMENT FILED |
30th Aug 2021 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED |
07th Jan 2021 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
05th Jan 2021 | EXTENSION 2 GRANTED |
05th Jan 2021 | EXTENSION 2 FILED |
05th Jan 2021 | TEAS EXTENSION RECEIVED |
14th Jul 2020 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
10th Jul 2020 | EXTENSION 1 FILED |
10th Jul 2020 | EXTENSION 1 GRANTED |
10th Jul 2020 | TEAS EXTENSION RECEIVED |