on 24 Jul 2018
Last Applicant/ Owned by
Singleton NSW 2330
AU
Serial Number
79185946 filed on 25th Feb 2016
Registration Number
5056968 registered on 11th Oct 2016
Correspondent Address
18 National Circuit
Barton ACT 2600
AUSTRALIA
Filing Basis
No Filing Basis
Disclaimer
NO DATA
Non-metal building materials in the nature of structural elements of plastic in the form of plastic modules and cells for installation in the ground to promote plant and tree growth and health, to control the flow of storm water and floodwater, to control soil erosion, and to assist the reinforcement of surfaces, namely, paved surfaces; non-metal building materials in the nature of structural plas Read More
Non-metal building materials in the nature of structural elements of plastic in the form of plastic modules and cells for installation in the ground to promote plant and tree growth and health, to control the flow of storm water and floodwater, to control soil erosion, and to assist the reinforcement of surfaces, namely, paved surfaces; non-metal building materials in the nature of structural plastic modules forming a load-bearing matrix for use in the ground for the sub-ground protection of trees and vegetation, for soil erosion control, for the reinforcement of surfaces, namely, paved surfaces, and for the filtration, treatment, storage and harvesting of ground water, storm water and floodwater; geotextiles being permeable fabrics made of polymers for use in the ground as tree pit lining, water filtration, soil erosion control and soil reinforcement
No 79185946
No Service/Collective Mark
No
No
No
No
No
No
No
No
No
Status Date | Action Taken |
---|---|
04th Sep 2018 | REQUEST FOR TRANSFORMATION PROCESSED - TOTAL |
21st Aug 2018 | TEAS REQUEST FOR TRANSFORMATION RECEIVED |
10th Aug 2018 | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED |
10th Aug 2018 | DEATH OF INTERNATIONAL REGISTRATION |
09th Jun 2017 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
02th Feb 2017 | NOTIFICATION PROCESSED BY IB |
17th Jan 2017 | FINAL DISPOSITION PROCESSED |
17th Jan 2017 | FINAL DISPOSITION NOTICE SENT TO IB |
10th Nov 2016 | GRANT OF PROTECTION CREATED, TO BE SENT TO IB |
11th Oct 2016 | REGISTERED-PRINCIPAL REGISTER |