on 03 Apr 2018
Last Applicant/ Owned by
CH-8645 Jona
CH
Serial Number
79209803 filed on 15th Mar 2017
Registration Number
N/A
Correspondent Address
Optingenstrasse 16
CH-3013 Bern
SWITZERLAND
Filing Basis
No Filing Basis
Disclaimer
NO DATA
Non-metallic rigid pipes for building; asphalt, pitch and bitumen; transportable buildings not of metal; monuments, not of metal; non-metallic building materials, namely, concrete, cement, clinker-style bricks and related components and additives for the above-mentioned goods, namely, additives for concrete, cement and clinker-style bricks Building construction, maintenance and repair services A Read More
Non-metallic rigid pipes for building; asphalt, pitch and bitumen; transportable buildings not of metal; monuments, not of metal; non-metallic building materials, namely, concrete, cement, clinker-style bricks and related components and additives for the above-mentioned goods, namely, additives for concrete, cement and clinker-style bricks
Building construction, maintenance and repair services
Architectural and engineering design, project planning, and consultancy services in the fields of building and civil engineering and the use of concrete and other construction materials; chemical engineering, project planning, and consulting services relating to the manufacture and treatment of concrete and other construction materials; performance of chemical analysis, namely expert chemical appraisals. Class 42 Version taken over from US-trademark Registration no. 79156881 LAFARGEHOLCIM with the identical list of services in class 42 accepted in 2015 by USPTO
No 79209803
No Service Mark
No
No
No
No
No
No
No
No
No
Status Date | Action Taken |
---|---|
20th Apr 2018 | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED |
19th Apr 2018 | DEATH OF INTERNATIONAL REGISTRATION |
11th Jan 2018 | NON-FINAL ACTION MAILED |
10th Jan 2018 | NON-FINAL ACTION WRITTEN |
18th Dec 2017 | TEAS/EMAIL CORRESPONDENCE ENTERED |
16th Dec 2017 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
16th Dec 2017 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
21st Jul 2017 | REFUSAL PROCESSED BY IB |
30th Jun 2017 | REFUSAL PROCESSED BY MPU |
30th Jun 2017 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |