on 16 Feb 2021
Last Applicant/ Owned by
87 Spring Lane
Plainville
CT
06062
Serial Number
88674850 filed on 30th Oct 2019
Registration Number
6273798 registered on 16th Feb 2021
Filing Basis
1. intent to use
2. use application currently
Disclaimer
NO DATA
Metal mounting and retention apparatus, namely, metal rails, guards, cross-members, bars, and solar rails; retention systems of metal with the grouping of components depending on the nature of the structure, having one or more sold as a unit consisting of rails, guards, cross-members, bars, solar rails, mounts, clamps, structural clamps, brackets, rail brackets, corrugated brackets, L-foot bracket Read More
Metal mounting and retention apparatus, namely, metal rails, guards, cross-members, bars, and solar rails; retention systems of metal with the grouping of components depending on the nature of the structure, having one or more sold as a unit consisting of rails, guards, cross-members, bars, solar rails, mounts, clamps, structural clamps, brackets, rail brackets, corrugated brackets, L-foot brackets, roofing mounts, membrane pads, snap locks, threaded stud, threaded nut, solar cap, grounding washer, threaded side lock, connector lock, connector plate, fasteners, slot fasteners, slot nuts, and structural fasteners
23rd Dec 2019
23rd Dec 2019
Providing education courses in the field of metal rail retention systems rendered through online non-downloadable videos
23rd Dec 2019
23rd Dec 2019
No 88674850
No Service Mark
No TM1310US00
No
No
No
No
No
No
No
No
Status Date | Action Taken |
---|---|
16th Feb 2021 | REGISTERED-PRINCIPAL REGISTER |
12th Jan 2021 | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED |
11th Jan 2021 | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED |
21st Dec 2020 | STATEMENT OF USE PROCESSING COMPLETE |
21st Dec 2020 | CASE ASSIGNED TO INTENT TO USE PARALEGAL |
08th Dec 2020 | USE AMENDMENT FILED |
08th Dec 2020 | TEAS STATEMENT OF USE RECEIVED |
09th Jun 2020 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
14th Apr 2020 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
14th Apr 2020 | PUBLISHED FOR OPPOSITION |