final action
on 18 Dec 2024
Last Applicant/ Owned by
CH-8049 Zürich
CH
Serial Number
79383878 filed on 20th Sep 2023
Registration Number
N/A
Correspondent Address
Stacey Halpern
Filing Basis
1. filing basis filed as 66 a
Disclaimer
NO DATA
Technical development in the nature of development of new technology for structural elements for the construction industry; construction work planning, namely, construction drafting; conducting of technical project studies for construction projects, namely, conducting scientific feasibility studies regarding construction projects; preparation of reports relating to technical project studies in the Read More
Technical development in the nature of development of new technology for structural elements for the construction industry; construction work planning, namely, construction drafting; conducting of technical project studies for construction projects, namely, conducting scientific feasibility studies regarding construction projects; preparation of reports relating to technical project studies in the nature of scientific feasibility studies regarding for construction projects; research with respect to building construction; engineering services in the field of construction technology; technical project studies being scientific feasibility studies in the field of construction; architectural services for the design of buildings; services provided by consultants in the field of architecture and construction drafting, namely, consultancy services in the field of architecture and construction drafting; design and development of computer software for the field of construction; providing temporary use online of non-downloadable software for designing, planning, optimization and manufacture of structural building solutions in the field of construction; software as a service (SaaS) services featuring software for designing, planning, optimization and manufacture of structural building solutions in the field of construction; design, maintenance and update of software for the field of construction; design, development, maintenance and update of process control software in the construction industry; design and development of software for the design, planning and manufacture of structural building solutions in the construction industry
N/A
N/A
Construction consultancy; services provided by consultants concerning building and housing construction, namely, construction consultancy services; providing advice with respect to building construction; consultancy with respect to the construction of buildings
N/A
N/A
Non-metallic construction materials, namely, slabs, columns, beams, panels, arches, vaults, bricks, blocks; transportable buildings not of metal; prefabricated buildings, not of metal; building materials of concrete, namely, slabs, columns, beams, panels, arches, vaults, bricks, blocks; construction materials not of metal, namely, slabs, columns, beams, panels, arches, vaults, bricks, blocks; concrete building elements, namely, slabs, columns, beams, panels, arches, vaults, bricks, blocks; modular construction materials, not of metal, namely, slabs, columns, beams, panels, arches, vaults, bricks, blocks; structural elements, not of metal, for construction, namely, slabs, columns, beams, panels, arches, vaults, bricks, blocks
N/A
N/A
Downloadable computer software for designing, planning, optimization and manufacture of structural building solutions in the field of construction; recorded computer software for the design, planning and assistance in the manufacture of structural building solutions in the field of construction; downloadable computer software for two or three-dimensional simulation for product design and development for the construction industry; downloadable computer software for the design and development of structural building elements for the construction industry
N/A
N/A
No 79383878
No Service Mark
No EBLM084.002I
No
No
No
No
Yes
Yes
No
No
Status Date | Action Taken |
---|---|
18th Dec 2024 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
18th Dec 2024 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
18th Dec 2024 | TEAS/EMAIL CORRESPONDENCE ENTERED |
15th Jul 2024 | REFUSAL PROCESSED BY IB |
24th Jun 2024 | REFUSAL PROCESSED BY MPU |
24th Jun 2024 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
05th Jun 2024 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
17th May 2024 | NON-FINAL ACTION WRITTEN |
14th May 2024 | ASSIGNED TO EXAMINER |
31st Dec 2023 | NEW REPRESENTATIVE AT IB RECEIVED |