on 22 Mar 2024
Last Applicant/ Owned by
Yuseong-gu
Daejeon
KR
Serial Number
79203179 filed on 16th Nov 2016
Registration Number
5243575 registered on 18th Jul 2017
Filing Basis
1. filing basis filed as 66 a
Disclaimer
NO DATA
[ Weighing apparatus and instruments for standard unit; weighing apparatus and instruments for derived unit; electronic controls for motors; automatic temperature controlling apparatus; ] electronic apparatus for testing the curing and drying of elastomeric and plastic materials; [ clamp meters for measuring electricity; ] precision measuring apparatus for measuring stress, pressure and temperatur Read More
[ Weighing apparatus and instruments for standard unit; weighing apparatus and instruments for derived unit; electronic controls for motors; automatic temperature controlling apparatus; ] electronic apparatus for testing the curing and drying of elastomeric and plastic materials; [ clamp meters for measuring electricity; ] precision measuring apparatus for measuring stress, pressure and temperature; physical and chemical laboratory apparatus and instruments for evaluating processibility of polymer, rubber and food materials; rheometers for measuring the viscosity and viscoelasticity of fluids; measuring apparatus for polymer processing properties; measuring apparatus for melt density; measuring apparatus for melt strength; measuring apparatus for melt index or melt flow rate; measuring apparatus for bulk density and apparent density of solid particulate; measuring apparatus for elongational viscosity; measuring apparatus for shear viscosity function
No 79203179
No Service/Collective Mark
No 1315
No
No
No
No
Yes
Yes
No
No
Status Date | Action Taken |
---|---|
22nd Mar 2024 | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. |
22nd Mar 2024 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED |
18th Mar 2024 | CASE ASSIGNED TO POST REGISTRATION PARALEGAL |
05th Jul 2023 | TEAS SECTION 71 & 15 RECEIVED |
29th Mar 2019 | NEW REPRESENTATIVE AT IB RECEIVED |
08th Sep 2017 | NOTIFICATION PROCESSED BY IB |
22nd Aug 2017 | FINAL DISPOSITION PROCESSED |
22nd Aug 2017 | FINAL DISPOSITION NOTICE SENT TO IB |
17th Aug 2017 | GRANT OF PROTECTION CREATED, TO BE SENT TO IB |
18th Jul 2017 | REGISTERED-PRINCIPAL REGISTER |