on 09 Jul 2024
Last Applicant/ Owned by
Egg Farm Lane, Kings Langley, HertfordshireWD4 8LR
GB
Serial Number
79357929 filed on 20th Oct 2022
Registration Number
7435302 registered on 09th Jul 2024
Correspondent Address
Joseph R. Dages
Filing Basis
1. filing basis filed as 66 a
Disclaimer
NO DATA
energy auditing; engineering services; programming of energy management software; design and development of energy management software; development of new energy and power management systems for others; consultancy relating to technological services in the field of power and energy supply; design and development of new energy distribution networks for others; advisory services, professional consul Read More
energy auditing; engineering services; programming of energy management software; design and development of energy management software; development of new energy and power management systems for others; consultancy relating to technological services in the field of power and energy supply; design and development of new energy distribution networks for others; advisory services, professional consultancy, technical and scientific research relating to energy, conservation, environment, power and energy generation, power and energy supply, power and energy distribution, energy efficiency, use of energy, energy conservation and environmental impact; information, advisory and consultancy services relating to all the aforementioned; design and development of new machines, equipment and apparatus for the production, storage and distribution of hydrogen for others; design of new facilities and installations for the production, storage and distribution of hydrogen for others; programming of software for the production, storage, and distribution of fuel; design and development of software for the production, storage, and distribution of fuel; development of management system software for the production, storage, and distribution of fuels; consultancy relating to technological services in the field of fuel production, storage and supply; information, advisory and consultancy services relating to all the aforementioned
N/A
N/A
Storage of energy; supply of electricity; energy distribution; renewable fuel distribution; information, advisory and consultancy services relating to all the aforementioned; storage of fuel; storage of fuel, namely, hydrogen fuel; hydrogen fuel distribution; information, advisory and consultancy services relating to all the aforementioned
N/A
N/A
Construction, installation, and maintenance of electricity generators; construction, installation, and maintenance of energy and power management systems; information, advisory and consultancy services relating to all the aforementioned; construction, installation, and maintenance of energy and power management systems; construction, installation, and maintenance of electricity generation facilities; installation and maintenance of electricity generators; construction, installation, and maintenance of energy and power storage facilities; construction, installation, and maintenance of facilities utilising batteries for electrical energy storage; information, advisory and consultancy services relating to all the aforementioned; construction, installation, and maintenance of hydrogen production facilities; construction, installation, and maintenance of hydrogen storage facilities; construction, installation, and maintenance of hydrogen distribution facilities; information, advisory and consultancy services relating to all the aforementioned
N/A
N/A
Solar panels for the production of electricity; batteries; downloadable computer software for use in the production, control, storage, distribution and transmission of electricity; downloadable computer software for use in the operation of electricity production, control, storage, distribution and transmission apparatus and equipment; hydrogen fuel cells; downloadable computer software for use in the production, control, storage, distribution and transmission of hydrogen; downloadable computer software for use in the operation of hydrogen production, control, storage, distribution and transmission apparatus and equipment
N/A
N/A
Electricity generation installations, including parts and fittings, namely, solar-powered, wind-powered, hydro-powered, geothermal-powered, bioenergy-powered, and hydrogen-powered electricity generators; installations for generating power from natural resources, namely, solar-powered, wind-powered, hydro-powered, geothermal-powered, bioenergy-powered, and hydrogen-powered electricity generators; installations for generating power from renewable resources, namely, solar-powered, wind-powered, hydro-powered, geothermal-powered, bioenergy-powered, and hydrogen-powered electricity generators; electricity generators; equipment, and apparatus, namely, electrolysis machines, for the production of hydrogen gas; equipment, and apparatus, namely, centrifugal and positive displacement compressors, for the storage of hydrogen gas; equipment, and apparatus, namely, cryogenic, centrifugal and positive displacement pumps, for the distribution of liquified hydrogen or hydrogen gas; installations, namely, electrolysis machines, for producing hydrogen gas; installations, namely, centrifugal and positive displacement compressors, for storing hydrogen gas; installations, namely, cryogenic, centrifugal and positive displacement pumps, for distributing liquified hydrogen or hydrogen gas
N/A
N/A
Electricity, namely, electrical energy; fuel, namely, hydrogen fuels; gaseous fuels, namely, hydrogen fuels
N/A
N/A
Hydrogen; hydrogen gas
N/A
N/A
Generation of electricity; information, advisory and consultancy services relating to all the aforementioned; production of fuels; production of hydrogen; processing of fuels; processing of hydrogen; information, advisory and consultancy services relating to all the aforementioned
N/A
N/A
No 79357929
No Service Mark
No RENEW-0002
No
No
No
No
Yes
Yes
No
No
Status Date | Action Taken |
---|---|
09th Oct 2024 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
09th Jul 2024 | NOTICE OF REGISTRATION CONFIRMATION EMAILED |
09th Jul 2024 | REGISTERED-PRINCIPAL REGISTER |
11th Jun 2024 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
15th May 2024 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
15th May 2024 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
23rd Apr 2024 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
23rd Apr 2024 | NOTIFICATION PROCESSED BY IB |
23rd Apr 2024 | PUBLISHED FOR OPPOSITION |
03rd Apr 2024 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |