failure to respond or late response
on 28 Jul 2023
lashlights; Sterilizers; Air-conditioning apparatus; Air purifying apparatus and machines; Air sterilizers; Combination ozone sanitizer and electric deodorizing units; Cooling installations for water; esk lamps; aucets for pipes and pipelines being parts of sanitary installations; ilters for drinking water; Hand basins being parts of sanitary installations; Ionization apparatus for the treatment o Read More
lashlights; Sterilizers; Air-conditioning apparatus; Air purifying apparatus and machines; Air sterilizers; Combination ozone sanitizer and electric deodorizing units; Cooling installations for water; esk lamps; aucets for pipes and pipelines being parts of sanitary installations; ilters for drinking water; Hand basins being parts of sanitary installations; Ionization apparatus for the treatment of air; Pipes being parts of sanitary facilities; Portable electric fans; Purification installations for sewage; Refrigerating appliances and installations; Sterilization units for buildings in the nature of apparatus that floods a room or space with anti-bacterial gas that eliminates all bacteria in the room or space; Water filtering apparatus; Water purifying apparatus and machines; Water sterilizers
01st Jun 2022
01st Jun 2022
No 97480627
No Service/Collective Mark
No
No
No
No
No
No
No
No
No
Status Date | Action Taken |
---|---|
28th Jul 2023 | ABANONMENT - AILURE TO RESPON OR LATE RESPONSE |
28th Jul 2023 | ABANONMENT NOTICE E-MAILE - AILURE TO RESPON |
13th Apr 2023 | ASSIGNE TO EXAMINER |
13th Apr 2023 | NON-INAL ACTION WRITTEN |
13th Apr 2023 | NON-INAL ACTION E-MAILE |
13th Apr 2023 | NOTIICATION O NON-INAL ACTION E-MAILE |
18th Jul 2022 | NEW APPLICATION OICE SUPPLIE ATA ENTERE |
02th Jul 2022 | NEW APPLICATION ENTERE |