tm logo
PEENG
Dead/Abandoned
ABANDONED - FAILURE TO RESPOND OR LATE RESPONSE

failure to respond or late response

on 04 Feb 2002

Last Applicant/ Owned by

Bergmannsgluckstr, 41-43

D-45896, Gelsenkirchen-Buer

DE

Serial Number

75857363 filed on 24th Nov 1999

Registration Number

N/A

Correspondent Address

Mark J. Rosenberg

MARK J. ROSENBERG

90 PARK AVENUE

NEW YORK, NEW YORK 10016

Filing Basis

1. intent to use

2. intent to use current

Disclaimer

NO DATA

PEENG

ENGINEERING, PROCESS CONTROL ENGINEERING, SECONDARY ENGINEERING, STRUCTURAL BUSINESS AND ORGANIZATIONAL CONSULTING IN THE ENERGY AREA; COST MANAGEMENT FOR TRADES AND INDUSTRIES WHICH USE LARGE AMOUNTS OF ENERGY; EXAMINATION, ANALYSIS,VISUALIZATION AND OPTIMIZATION OF POWER OPERATIONS, ENERGY CONSUMPTION VALUES AND ENERGY COST VALUES; EVALUATION AND ANALYSIS OF POWER-ECONOMICAL AND BUSINESS DATA E Read More

Classification Information


Class [042]
Computer & Software Services & Scientific Services


ENERGY USAGE MANAGEMENT; TECHNICAL CONSULTATION IN THE ENERGY AREA; CONSULTATION DURING THE PLANNING, CONSTRUCTION AND OPERATION OF POWER PLANTS, NAMELY COAL- FIRED, WASTE-FED AND ATOMIC POWERED, STEAM POWERED, GASPOWERED AND WATER POWERED POWER PLANTS, WASTE DISPOSAL PLANTS, NAMELY WASTE UTILIZATION AND WASTE INCINERATION PLANTS, CLEANSING PLANTS, NAMELY DESULPHURIZATION AND DENITRIFICATION PLANTS, AS WELL AS POWER NETWORKS, NAMELY DISTRICT HEATING AND ELECTRICITY NETWORKS; CONSULTATION DURING THE PLANNING, CONSTRUCTION AND OPERATION OF WATER SUPPLY AND WATER DISPOSAL PLANTS; CONSULTATION IN THE AREA OF MACHINE ENGINEERING, STEAM PRODUCTION, FLUE GAS CLEANSING, TURBOMACHINES, WATER-STEAM CIRCULATIONS, WATER ENGINEERING, NUCLEAR ENGINEERING, ELECTRIC ENGINEERING, PIPINGS, FITTINGS, MATERIALS AND WELDING ENGINEERING, CONTROL AND INSTRUMENTATION ENGINEERING, PROCESS CONTROL ENGINEERING, SECONDARY ENGINEERING, STRUCTURAL ENGINEERING, BUILDING PLANNING, PLANNING OF SUPPORTING FRAMEWORK, ENVIRONMENTAL ENGINEERING ANALYSIS, CHEMICAL ENGINEERING, NETWORK ENGINEERING, NETWORK PLANNING, SUBSTATIONS, LINE ENGINEERING, POWER SYSTEM MANAGEMENT AND COMMUNICATIONS ENGINEERING; SERVICES IN THE ENVIRONMENTAL FIELD, NAMELY THE PERFORMANCE OF MEASUREMENTS AND ANALYSIS IN ENVIRONMENTAL TECHNOLOGY, ADJUSTMENT OF ENVIRONMENTAL AND FIRING INSTALLATIONS, DRAFTING OF ENVIRONMENTAL EXPERT OPINIONS. SERVICES IN THE ENERGY FIELD, NAMELY OBTAINING PERMITS FOR TECHNICAL INSTALLATIONS, OPERATION MONITORING, PERFORMANCE OF CHEMICAL ANALYSIS, QUALITY MONITORING, SUPERVISION OF PRODUCTION, ASSEMBLAGE AND CONSTRUCTION, PERFORMANCE OF COMMISSIONINGS AND INSPECTIONS, DRAFTING OF TECHNICAL EXPERT OPINIONS; DEVELOPMENT, WRITING AND UPDATE OF DATA PROCESSING PROGRAMS FOR THE CONTROL, MONITORING AND ERROR ANALYSIS OF TECHNICAL INSTALLATIONS AS WELL AS SUCH FOR DATA CAPTURE

Class [035]
Advertising, Business & Retail Services


ENGINEERING, PROCESS CONTROL ENGINEERING, SECONDARY ENGINEERING, STRUCTURAL BUSINESS AND ORGANIZATIONAL CONSULTING IN THE ENERGY AREA; COST MANAGEMENT FOR TRADES AND INDUSTRIES WHICH USE LARGE AMOUNTS OF ENERGY; EXAMINATION, ANALYSIS,VISUALIZATION AND OPTIMIZATION OF POWER OPERATIONS, ENERGY CONSUMPTION VALUES AND ENERGY COST VALUES; EVALUATION AND ANALYSIS OF POWER-ECONOMICAL AND BUSINESS DATA

Mark Details


Serial Number

No 75857363

Mark Type

No Service Mark

Attorney Docket Number

No 22048/8

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

No

66A Current

No

Current Basis

No

No Basis

No

Legal History


Status DateAction Taken
04th Feb 2002ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
12th Jun 2001FINAL REFUSAL MAILED
24th May 2001ASSIGNED TO EXAMINER
15th Jun 2000NON-FINAL ACTION MAILED
09th Jun 2000ASSIGNED TO EXAMINER