on 21 Sep 2021
Last Applicant/ Owned by
Prestons NSW 2170
AU
Serial Number
79292066 filed on 27th Jul 2020
Registration Number
6488547 registered on 21st Sep 2021
Filing Basis
No Filing Basis
Disclaimer
NO DATA
Asphalt; asphalt paving, namely, asphalt paving compositions; road asphalt; pitch; bitumen; composite bitumen; bitumen-based compositions for building purposes, namely, mixtures of bitumen and plastics for making roads; road making non-metallic materials, namely, road asphalt; roads of non-metallic materials, namely, road asphalt; materials for making and coating roads, namely, asphalt, pitch and Read More
Asphalt; asphalt paving, namely, asphalt paving compositions; road asphalt; pitch; bitumen; composite bitumen; bitumen-based compositions for building purposes, namely, mixtures of bitumen and plastics for making roads; road making non-metallic materials, namely, road asphalt; roads of non-metallic materials, namely, road asphalt; materials for making and coating roads, namely, asphalt, pitch and bitumen, asphalt composition paving; non-metallic materials for coating roads, namely, tar-based sealants for asphalt, tar-based driveway sealants; bituminous sealing compounds for use in road laying, namely, tar-based sealants for asphalt; non-metallic materials for making roads, namely, asphalt, pitch and bitumen, asphalt paving compositions; non-metallic materials for repairing roads, namely, tar-based concrete and asphalt patching compound; non-metallic materials for surfacing roads, namely, asphalt paving compositions; non-metallic materials for use in patching roads, namely, asphalt patching compound made of a tar base, concrete patching compound made of a tar base, patching compound made of a tar base; non-metallic materials for use in repairing roads, namely, patching compound made of a tar base, asphalt patching compound made of a tar base, road asphalt; non-metallic materials for use in surfacing roads, namely, asphalt paving compositions; non-metallic materials for use in the construction of roads, namely, road asphalt; non-metallic road making materials, namely, soil being non-metal building materials, stones, sand, bitumen, pitch, plastic granules and plastic pellets for making roads, concrete, recycled road asphalt, and recycled glass granules for making roads, reclaimed asphalt pavement; polymeric bitumen emulsions for road surfaces; non-metallic materials for use in paving, namely, asphalt paving compositions; non-metallic composite structures for paving of surfaces, namely, asphalt paving compositions; non-metallic paving materials, namely, asphalt paving compositions; non-metallic paving products, namely, asphalt paving compositions, road asphalt
Asphalting; building of roads, namely, road construction, road paving, road sealing and stripping; maintenance of roads; road building, namely, road construction, road paving, road sealing and stripping; road construction; road paving; road surfacing, namely, road paving; paving services, namely, road paving, paving contractor services; advisory services relating to building construction materials, namely, technical consultation in the field of building materials, namely, cementitious materials, asphalt and aggregates; civil construction services, namely, construction of civil engineering structures; civil engineering construction consultancy; civil engineering construction, namely, construction of civil engineering structures; advisory services relating to construction; general construction contracting; construction supervision; construction planning; construction consultation; construction engineering, namely, construction of civil engineering structures; provision of construction information; supervision of building construction; supervision of construction; supervision of construction projects; on-site construction supervision
No 79292066
No Service Mark
No T-4637 US MP
No
No
No
No
No
No
No
No
Status Date | Action Taken |
---|---|
21st Mar 2022 | FINAL DECISION TRANSACTION PROCESSED BY IB |
02th Mar 2022 | FINAL DISPOSITION NOTICE SENT TO IB |
02th Mar 2022 | FINAL DISPOSITION PROCESSED |
21st Dec 2021 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
21st Sep 2021 | REGISTERED-PRINCIPAL REGISTER |
18th Jul 2021 | NOTIFICATION PROCESSED BY IB |
06th Jul 2021 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
06th Jul 2021 | PUBLISHED FOR OPPOSITION |
30th Jun 2021 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
30th Jun 2021 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |