failure to respond or late response
on 29 Dec 2020
Last Applicant/ Owned by
Waiake; Auckland 0630
NZ
Serial Number
79282160 filed on 25th Feb 2020
Registration Number
N/A
Correspondent Address
Auckland 1142
New Zealand
Filing Basis
No Filing Basis
Disclaimer
NO DATA
Construction materials, not of metal; constructions materials made of recycled plastic; slurry made of plastic for building and construction purposes; non-metallic materials for use in the construction of roads; non-metallic materials for making roads; non-metallic materials for surfacing roads; non-metallic materials for use in making roads; non-metallic materials for use in patching roads; non-m Read More
Construction materials, not of metal; constructions materials made of recycled plastic; slurry made of plastic for building and construction purposes; non-metallic materials for use in the construction of roads; non-metallic materials for making roads; non-metallic materials for surfacing roads; non-metallic materials for use in making roads; non-metallic materials for use in patching roads; non-metallic materials for use in repairing roads; non-metallic materials for use in surfacing roads; plastic articles for use in construction; construction elements of plastic; plastic materials for constructional purposes; plastic flooring materials; non-metallic road making materials
Recycling of plastics
No 79282160
No Service Mark
No
No
No
No
No
No
No
No
No
Status Date | Action Taken |
---|---|
15th Jan 2022 | FINAL DECISION TRANSACTION PROCESSED BY IB |
29th Dec 2021 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
29th Dec 2021 | FINAL DISPOSITION NOTICE SENT TO IB |
25th Sep 2021 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
08th Sep 2021 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
08th Sep 2021 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
29th Dec 2020 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
29th Dec 2020 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
25th Aug 2020 | NEW REPRESENTATIVE AT IB RECEIVED |
06th Aug 2020 | LETTER OF PROTEST EVIDENCE REVIEWED-NO FURTHER ACTION TAKEN |