tm logo
N-PEAK
Live/Registered
REGISTERED

on 02 Jul 2019

Last Applicant/ Owned by

N-4621 Kristiansand S

NO

Serial Number

79244123 filed on 02th Aug 2018

Registration Number

5790827 registered on 02th Jul 2019

in the Principal Register

Correspondent Address

Charles P. Bacall

Charles P. Bacall Verrill Dana, LLP

Portland, ME 04101-4054

UNITED STATES

Filing Basis

1. filing basis filed as 66 a

Disclaimer

NO DATA

N-PEAK

Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity and solar energy, namely, solar wafers, solar cells, solar modules, namely photovoltaic solar modules for converting solar radiation into electrical energy, electric current switches; photovoltaic apparatus and installations for generating solar electricity, namely, photovoltaic c Read More

Classification Information


Class [009]
Computer & Software Products & Electrical & Scientific Products


Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity and solar energy, namely, solar wafers, solar cells, solar modules, namely photovoltaic solar modules for converting solar radiation into electrical energy, electric current switches; photovoltaic apparatus and installations for generating solar electricity, namely, photovoltaic cells and modules; solar wafers, solar cells, solar panels, solar panel arrays for the production of electricity, electronic sensors for measuring solar radiation; semi-conductors for solar cells


First Use Date in General

N/A

First Use Date in Commerce

N/A

Mark Details


Serial Number

No 79244123

Mark Type

No Service/Collective Mark

Attorney Docket Number

No 41116-3769

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

Yes

66A Current

Yes

Current Basis

No

No Basis

No

Legal History


Show more

Status DateAction Taken
02th Jul 2024COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
29th May 2021CHANGE OF NAME/ADDRESS REC'D FROM IB
08th Nov 2019FINAL DECISION TRANSACTION PROCESSED BY IB
24th Oct 2019FINAL DISPOSITION PROCESSED
24th Oct 2019FINAL DISPOSITION NOTICE SENT TO IB
02th Oct 2019FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
02th Jul 2019REGISTERED-PRINCIPAL REGISTER
16th Apr 2019OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
16th Apr 2019PUBLISHED FOR OPPOSITION
27th Mar 2019NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED