on 23 Nov 2021
Last Applicant/ Owned by
SE-411 29 Göteborg
SE
Serial Number
79289996 filed on 08th Apr 2020
Registration Number
6564652 registered on 23rd Nov 2021
Correspondent Address
JOSH A. PARTINGTON
Filing Basis
No Filing Basis
Disclaimer
NO DATA
Custom manufacture of prefabricated construction elements; custom manufacturing and finishing of materials, namely, custom manufacture of and applying finishes to modular components for modular buildings, transportable buildings, modular components for wind power towers, glue-laminated wood, semi-worked wood for building, modular structures for wind power towers, and materials for constructing win Read More
Wind-powered electricity generators; machine parts, namely, towers for wind power in wind turbines; machine parts, namely, blades for wind turbines
Non-metallic building materials, namely, modular non-metal components for wind power towers in the nature of framework for building, door panels, wall panels, water-resistant boards and panels for construction; non-metal laminates, namely, glue-laminated wood; laminates of non-metallic materials for use in building, namely, non-metal pilings, non-metal building panels, non-metal building frameworks, and nonmetal pillars for building; semi-worked wood for building; wood rafters; wooden floor tiles; wood siding; non-metal modular building units, namely, non-metal materials for constructing wind power towers in the nature of framework for building, door panels, wall panels, water-resistant boards and panels for construction; modular superstructures, not of metal, namely, modular non-metal structures for wind energy generation; wood panelling; pillars, not of metal, for building; agglomerated cork for building; multi-layered wood; shaped timber; non-metallic transportable buildings; monuments, not of metal; non-metallic rigid pipes; water-pipes, not of metal
Construction services, namely construction of wind power towers, wind power plants, and modular buildings; building construction; construction of wind power plants; installation of wind power systems; maintenance and repair of wind power plants; building construction consultancy; providing construction information; services for the construction of buildings, namely, construction, mounting in the nature of installation and repair of wind turbines and component parts for wind power towers, wind power plants, and modular buildings; consultancy and information services relating to construction, namely, consulting services and providing information in the fields of construction; installation of high tensile structures; installation of fabricated construction units
Custom manufacture of prefabricated construction elements; custom manufacturing and finishing of materials, namely, custom manufacture of and applying finishes to modular components for modular buildings, transportable buildings, modular components for wind power towers, glue-laminated wood, semi-worked wood for building, modular structures for wind power towers, and materials for constructing wind power towers
Construction engineering services, namely, structural engineering design services; design services for high tensile structures; technical consultancy services relating to structural engineering; construction drafting; design and development of industrial products, namely, design and development of new technology for others and product design in the field of modular components for modular buildings, wind power towers, transportable buildings, modular components for wind power towers, glue-laminated wood, semi-worked wood for building, modular structures for wind power towers, and materials for constructing wind power towers; design and development of industrial products, namely, product design and development in the fields of wind power towers and wind power tower components; research and development of new goods, for others, in the field of wooden materials
No 79289996
No Service Mark
No 2600TM200008
No
No
No
No
No
No
No
No
Status Date | Action Taken |
---|---|
23rd Feb 2022 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
23rd Nov 2021 | REGISTERED-PRINCIPAL REGISTER |
07th Sep 2021 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
07th Sep 2021 | PUBLISHED FOR OPPOSITION |
05th Sep 2021 | NOTIFICATION PROCESSED BY IB |
18th Aug 2021 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
18th Aug 2021 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
18th Aug 2021 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
30th Jul 2021 | APPROVED FOR PUB - PRINCIPAL REGISTER |
02th Jul 2021 | EX PARTE APPEAL-INSTITUTED |