tm logo
MFG TILE TECH PAVER SYSTEM
Live/Registered
REGISTERED

on 19 Jul 2022

Last Applicant/ Owned by

4730 E. 26th Street

Vernon

CA

90058

Serial Number

90404345 filed on 22nd Dec 2020

Registration Number

6798688 registered on 19th Jul 2022

in the Principal Register

Correspondent Address

Mark B. Mizrahi

Mark B. Mizrahi

1888 CENTURY PARK EAST

15TH FLOOR

LOS ANGELES,CA 90067

Filing Basis

1. intent to use

2. use application currently

Disclaimer

NO DATA

MFG TILE TECH PAVER SYSTEM

Building materials, namely, plastic pedestals for elevating pavers; non-metal floor tiles; pavement tiles; paver tiles; pavers; non-metallic paving blocks; paving stones; paving tiles; tiles of clay, glass, gypsum, ceramic or earthenware; wood tile floors

Classification Information


Class [019]
Non-Metallic Building Material Products


Building materials, namely, plastic pedestals for elevating pavers; non-metal floor tiles; pavement tiles; paver tiles; pavers; non-metallic paving blocks; paving stones; paving tiles; tiles of clay, glass, gypsum, ceramic or earthenware; wood tile floors


First Use Date in General

30th Sep 2019

First Use Date in Commerce

30th Sep 2019

Mark Details


Serial Number

No 90404345

Mark Type

No Service/Collective Mark

Attorney Docket Number

No 27165-200

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

No

66A Current

No

Current Basis

No

No Basis

No

Design Code(s)

26.05.13 -

Two Triangles

26.05.21 -

Triangles that are completely or partially shaded

26.05.25 -

Triangles with one or more curved sides

26.09.02 -

Plain single line squares

26.09.14 -

Three or more squares

26.17.01 -

Straight line(s), band(s) or bar(s)

26.17.04 -

Vertical line(s), band(s) or bar(s)

Legal History


Show more

Status DateAction Taken
26th Oct 2023TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
26th Oct 2023ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
26th Oct 2023TEAS CHANGE OF CORRESPONDENCE RECEIVED
19th Jul 2022REGISTERED-PRINCIPAL REGISTER
19th Jul 2022NOTICE OF REGISTRATION CONFIRMATION EMAILED
15th Jun 2022NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
14th Jun 2022ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
20th May 2022STATEMENT OF USE PROCESSING COMPLETE
19th May 2022CASE ASSIGNED TO INTENT TO USE PARALEGAL
09th May 2022TEAS STATEMENT OF USE RECEIVED