failure to respond or late response
on 31 Jan 2024
Last Applicant/ Owned by
LEIGH-ON-SEA Essex SS9 2AD
GB
Serial Number
79353796 filed on 28th Jul 2022
Registration Number
N/A
Correspondent Address
London SE1 9RA,
UNITED KINGDOM
Filing Basis
1. filing basis filed as 66 a
Disclaimer
NO DATA
Pedal scooters; motor scooters; scooters [vehicles]; motorized scooters; scooters [for transportation]; electrically powered scooters; electrically operated scooters; push scooters [vehicles]; self-balancing scooters; electrically-powered motor scooters; baskets adapted for scooters; non-motorized scooters [vehicles]; electrically powered scooters [vehicles]; self balancing electric scooters; elec Read More
Rental of scooters for transportation purposes; bicycle rental; bicycle sharing services; rental of bicycles
N/A
N/A
Pedal scooters; motor scooters; scooters [vehicles]; motorized scooters; scooters [for transportation]; electrically powered scooters; electrically operated scooters; push scooters [vehicles]; self-balancing scooters; electrically-powered motor scooters; baskets adapted for scooters; non-motorized scooters [vehicles]; electrically powered scooters [vehicles]; self balancing electric scooters; electric one wheel scooters; self-balancing one-wheeled electric scooters; self-balancing two-wheeled electric scooters; motorized and non-motorized scooters for personal transportation; motorised scooters for the disabled and those with mobility difficulties; scooters; bicycles; pedal bicycles; bicycle handlebars; bicycle motors; motorized bicycles; sports bicycles; bicycle trailers; motorised bicycles; folding bicycles; touring bicycles; mountain bicycles; delivery bicycles; electric bicycles; road racing bicycles; handlebars [bicycle parts]; motors for bicycles; drivetrains for bicycles; bicycle structural parts; bicycle handle bars; bicycle stands [kickstands]; freewheels for bicycles; engines for bicycles; bags for bicycles; balance bicycles [vehicles]; hubs for bicycles; bicycle handlebar grips; bicycle trailers (riyakah); frames for bicycles; bicycle racks [carriers]; kickstands for bicycles; folding electric bicycles; handlebars for bicycles, cycles; direction indicators for bicycles; handlebar ends for bicycles; direction signals for bicycles; frames for bicycles, cycles; panniers adapted for bicycles; drive trains [bicycle parts]; handlebar grips for bicycles; luggage carriers for bicycles; luggage racks for bicycles; shock absorbers for bicycles; warning horns for bicycles; tricycles; delivery tricycles; carrier tricycles; tricycles (carrier -); electric vehicles; vehicles (electric -); electric trucks [vehicles]; electrically operated vehicles; electrically powered vehicles; electric land vehicles; electric horns for vehicles; electrically powered motor vehicles; electrically powered land vehicles; self-propelled electric vehicle; electric drives for use in land vehicles; self-propelled electric vehicles; motors, electric, for land vehicles; electric motors for land vehicles; electrical motors for land vehicles; electrical drives for land vehicles; electric engines for land vehicles; electric drives for land vehicles; electric reversing alarms for vehicles; electric driving motors for land vehicles; electric propulsion mechanisms for land vehicles; geared electric motors for land vehicles; electrical anti-theft installations for vehicles; electric motors for two-wheeled vehicles; electric drives for land vehicle motors; vehicles
N/A
N/A
Bicycle speedometers; bicycle helmets; helmets for bicycles; locks (electric) for bicycles; electric batteries for powering electric vehicles; electric batteries for vehicles; batteries, electric, for vehicles; batteries for electric vehicles; electric locks for vehicles; charging stations for electric vehicles
N/A
N/A
No 79353796
No Service Mark
No
No
No
No
No
Yes
Yes
No
No
26.01.03 -
Incomplete circles (more than semi-circles)
26.01.12 -
Circles with bars, bands and lines
26.01.28 -
Miscellaneous circular designs with an irregular circumference
26.17.09 -
Curved line(s), band(s) or bar(s)
Status Date | Action Taken |
---|---|
15th Apr 2024 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
27th Mar 2024 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
27th Mar 2024 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
31st Jan 2024 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
31st Jan 2024 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
01st Aug 2023 | REFUSAL PROCESSED BY IB |
08th Jul 2023 | REFUSAL PROCESSED BY MPU |
08th Jul 2023 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
31st May 2023 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
30th May 2023 | NON-FINAL ACTION WRITTEN |