on 05 May 2020
Last Applicant/ Owned by
S.P. 37 Conversano-Castiglione, Km 0,570
Conversano (BA)
IT
70014
Serial Number
87767913 filed on 24th Jan 2018
Registration Number
6048137 registered on 05th May 2020
Filing Basis
1. intent to use
2. use application currently
Disclaimer
NO DATA
Building materials, namely, manufactured cement, marble, stone, veneer for use on floors, walls, panels, fascia, countertops, exterior surfaces, and fireplaces; non-metallic rigid pipes for construction purposes; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal doors and windows of metal; metal components for windows and doors, namely, side frames, end cap Read More
doors and windows of metal; metal components for windows and doors, namely, side frames, end caps, cranks, handles, slides, clasps, locks, keys, cylinders, hinges, pins, swivels
06th Aug 2019
06th Aug 2019
sealing and insulating materials; non-metal weather strips for building
06th Aug 2019
06th Aug 2019
Building materials, namely, manufactured cement, marble, stone, veneer for use on floors, walls, panels, fascia, countertops, exterior surfaces, and fireplaces; non-metallic rigid pipes for construction purposes; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal
06th Aug 2019
06th Aug 2019
Nonmetal door and window hardware, namely, keys, guards and clasps; mirrors; residential and commercial furniture
06th Aug 2019
06th Aug 2019
No 87767913
No Service/Collective Mark
No 44968-171897
No
No
No
No
No
No
No
No
26.07.01 -
Plain diamonds with single or multiple line borders
Status Date | Action Taken |
---|---|
05th May 2020 | REGISTERED-PRINCIPAL REGISTER |
31st Mar 2020 | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED |
28th Mar 2020 | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED |
06th Mar 2020 | STATEMENT OF USE PROCESSING COMPLETE |
06th Mar 2020 | CASE ASSIGNED TO INTENT TO USE PARALEGAL |
14th Feb 2020 | TEAS STATEMENT OF USE RECEIVED |
14th Feb 2020 | USE AMENDMENT FILED |
15th Aug 2019 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
13th Aug 2019 | EXTENSION 2 GRANTED |
13th Aug 2019 | EXTENSION 2 FILED |