on 21 Jul 2020
Last Applicant/ Owned by
Rizhao 276800 Shandong
CN
Serial Number
79260328 filed on 31st Oct 2018
Registration Number
6104073 registered on 21st Jul 2020
Correspondent Address
Dana Stewart-Mekdara
Filing Basis
No Filing Basis
Disclaimer
NO DATA
Metalworking machine tools; handling apparatus for loading and unloading, namely, cargo handling machines, belt conveyors; hydraulic machines, namely, hydraulic excavators, hydraulic hammers; machine tools, namely, lathes, powered machines for cutting or shaping or finishing metals or other materials; electroplating machines; mixing machines; foundry machines, namely, forging machines, forge blowe Read More
Materials of metal for railway construction; Metal hardware in the nature of hooks; pipes of metal; metal falsework buckle; building materials of metal, namely, soffits, awnings, beams; ironwork for doors; common metals, unwrought or semi-wrought; slings of metal for handling loads; clips of metal for cables and pipes; Small hardware of metal, namely, hinges, screws, bolts
Metalworking machine tools; handling apparatus for loading and unloading, namely, cargo handling machines, belt conveyors; hydraulic machines, namely, hydraulic excavators, hydraulic hammers; machine tools, namely, lathes, powered machines for cutting or shaping or finishing metals or other materials; electroplating machines; mixing machines; foundry machines, namely, forging machines, forge blowers; casting equipment, namely, casting machines; stereo-garage with lifter, namely, power-operated lift for moving, parking and storing land vehicles; soldering apparatus, electric
Cars; bicycles; telpher railways, namely, cable cars; boats; rolling stock for railways; axles for vehicles; vehicles for locomotion by land, air, water or rail, namely, all terrain vehicles (ATVs), locomotives, helicopters; tires for vehicle wheels; hubs for vehicle wheels; air vehicles, namely, aircraft, drones
No 79260328
No Service/Collective Mark
No 1807USA
No
No
No
No
No
No
No
No
Status Date | Action Taken |
---|---|
28th Nov 2020 | FINAL DECISION TRANSACTION PROCESSED BY IB |
10th Nov 2020 | FINAL DISPOSITION PROCESSED |
10th Nov 2020 | FINAL DISPOSITION NOTICE SENT TO IB |
21st Oct 2020 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
21st Jul 2020 | REGISTERED-PRINCIPAL REGISTER |
05th May 2020 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
05th May 2020 | PUBLISHED FOR OPPOSITION |
15th Apr 2020 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
02th Apr 2020 | APPROVED FOR PUB - PRINCIPAL REGISTER |
01st Apr 2020 | TEAS/EMAIL CORRESPONDENCE ENTERED |