final action
on 08 Oct 2024
Last Applicant/ Owned by
SE-401 25 Göteborg
SE
Serial Number
79400392 filed on 14th Dec 2023
Registration Number
N/A
Correspondent Address
Filing Basis
1. filing basis filed as 66 a
Disclaimer
NO DATA
Fabric inserts for tool boxes; tool bags with molded base [not of metal]. Bucket tool organizer in fabric. Bags and sacks for packaging, storage and transport; sacks for the transport and storage of materials in bulk; bags [sacks] for transportation purposes; bags and sacks for storing tools and construction waste; bags [sacks] made of synthetic plastics material. Bags; tool bags, sold empty; t Read More
Bags and sacks for packaging, storage and transport; sacks for the transport and storage of materials in bulk; bags [sacks] for transportation purposes; bags and sacks for storing tools and construction waste; bags [sacks] made of synthetic plastics material.
N/A
N/A
Bucket tool organizer in fabric.
N/A
N/A
Fabric inserts for tool boxes; tool bags with molded base [not of metal].
N/A
N/A
Bags; tool bags, sold empty; tool backpacks, sold empty; equipment bags; open tool bags with molded base, sold empty; cross-body bags; drawstring bags for tools; softsided tool bags; craftsman backpack; sorting bags; tool pouches, sold empty; tool pouches, empty.
N/A
N/A
Tool pouches for attachment to tool belts; tool belts; tool belts [holders], tool bags [filled]; electrician's tool belt; builder's tool belt; tool holsters, empty [holders]; tool pouches with nail pockets.
N/A
N/A
No 79400392
No Service/Collective Mark
No
No
No
No
No
Yes
Yes
No
No
26.01.21 -
Circles that are totally or partially shaded
26.05.02 -
Plain single line triangles
26.17.01 -
Straight line(s), band(s) or bar(s)
26.17.04 -
Vertical line(s), band(s) or bar(s)
26.17.05 -
Horizontal line(s), band(s) or bar(s)
26.17.06 -
Diagonal line(s), band(s) or bar(s)
Status Date | Action Taken |
---|---|
26th Oct 2024 | REFUSAL PROCESSED BY IB |
08th Oct 2024 | REFUSAL PROCESSED BY MPU |
08th Oct 2024 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
04th Oct 2024 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
03rd Oct 2024 | NON-FINAL ACTION WRITTEN |
02th Oct 2024 | ASSIGNED TO EXAMINER |
01st Oct 2024 | APPLICATION FILING RECEIPT MAILED |
01st Oct 2024 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
25th Jul 2024 | SN ASSIGNED FOR SECT 66A APPL FROM IB |