on 24 Dec 2019
Last Applicant/ Owned by
Committee, Bajia Town,
Yangchun City
CN
529600
Serial Number
88440899 filed on 22nd May 2019
Registration Number
5942667 registered on 24th Dec 2019
Filing Basis
1. use application currently
Disclaimer
NO DATA
Building materials, namely, manufactured brick veneer for use on interior and exterior walls, floors and surfaces, patios, poolsides and driveways; Decorative hearth extensions in the nature of fireproof tiles made of non-metal, non-combustible materials used to decorate and protect the floor surface immediately in front of fireplaces; Non-metal architectural mouldings and finish trim; Non-metal b Read More
Building materials, namely, manufactured brick veneer for use on interior and exterior walls, floors and surfaces, patios, poolsides and driveways; Decorative hearth extensions in the nature of fireproof tiles made of non-metal, non-combustible materials used to decorate and protect the floor surface immediately in front of fireplaces; Non-metal architectural mouldings and finish trim; Non-metal building materials, namely, fiberglass panels, floor boards, fascia; Non-metal decking; Non-metal tile trim; Non-metal wall claddings for building; Non-metal wall tiles; Nonstructural building materials, namely, granite used in decorative surface applications for countertops and vanity tops; Nonwoven textile fabrics for use in construction and as a housewrap
01st May 2019
01st May 2019
No 88440899
No Service/Collective Mark
No
No
No
No
No
No
No
No
No
07.01.06 -
Other stylized houses
07.07.02 -
Windows
07.07.03 -
Roofs
Status Date | Action Taken |
---|---|
24th Dec 2019 | REGISTERED-PRINCIPAL REGISTER |
08th Oct 2019 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
08th Oct 2019 | PUBLISHED FOR OPPOSITION |
18th Sep 2019 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
03rd Sep 2019 | ASSIGNED TO LIE |
27th Aug 2019 | APPROVED FOR PUB - PRINCIPAL REGISTER |
26th Aug 2019 | TEAS/EMAIL CORRESPONDENCE ENTERED |
25th Aug 2019 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
25th Aug 2019 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
13th Aug 2019 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |