failure to respond or late response
on 19 Nov 2024
Last Applicant/ Owned by
Shenzhen (Harbin) Industrial Park, No. 288 Zhigu Street, Songbei District, Harbin City Heilongjiang Province
CN
Serial Number
79383984 filed on 25th Aug 2023
Registration Number
N/A
Correspondent Address
Changjiangwan Commercial Plaza,
Jiangsu,
CHINA
Filing Basis
1. filing basis filed as 66 a
Disclaimer
NO DATA
Agricultural machines; mixers [machines]; food processors, electric; hoists; pumps [parts of machines, engines or motors]; filter presses Computers; mechanical signs; intercommunication apparatus; projection apparatus; cases especially made for photographic apparatus and instruments; surveying apparatus and instruments; apparatus and instruments for astronomy; transformers [electricity]; electric Read More
Computers; mechanical signs; intercommunication apparatus; projection apparatus; cases especially made for photographic apparatus and instruments; surveying apparatus and instruments; apparatus and instruments for astronomy; transformers [electricity]; electric installations for the remote control of industrial operations; protection devices for personal use against accidents; computer software, recorded; computer hardware; satellite navigation devices; navigation apparatus for vehicles [on-board computers]; surveying apparatus and instruments; gyroscopes; counters; probes for scientific purposes; cables for the transmission of sounds and images; sensors
N/A
N/A
Agricultural machines; mixers [machines]; food processors, electric; hoists; pumps [parts of machines, engines or motors]; filter presses
N/A
N/A
No 79383984
No Service/Collective Mark
No
No
No
No
No
Yes
Yes
No
No
18.11.02 -
Ship's wheels, steering wheels
29.01.07 -
Small, inconspicuous design elements functioning as punctuation or parts of letters
Status Date | Action Taken |
---|---|
19th Nov 2024 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
19th Nov 2024 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
28th May 2024 | REFUSAL PROCESSED BY IB |
08th May 2024 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
07th May 2024 | REFUSAL PROCESSED BY MPU |
02th May 2024 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
01st May 2024 | NON-FINAL ACTION WRITTEN |
25th Apr 2024 | ASSIGNED TO EXAMINER |
05th Dec 2023 | APPLICATION FILING RECEIPT MAILED |
01st Dec 2023 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |