on 14 Apr 2020
Last Applicant/ Owned by
Singapore 068898
SG
Serial Number
79256798 filed on 09th Jan 2019
Registration Number
6031440 registered on 14th Apr 2020
Correspondent Address
Chaoyang District
Beijing
China
Filing Basis
No Filing Basis
Disclaimer
NO DATA
Production of energy; generation of electricity from solar energy; generation of electricity from wind energy; sandblasting services; metal casting; welding services; decontamination of hazardous materials; water treating; generation of electricity; generation of energy; production of energy by power plants Solar panels for the production of electricity; charging stations for electric vehicles; b Read More
Solar panels for the production of electricity; charging stations for electric vehicles; batteries, electric; battery chargers; solar wafers; video screens; electrified fences; photoelectric converters; electronic control installations for the automatization of power station; lightning arresters; electrolysers; solar-powered battery chargers; solar cells; solar collectors for electricity generation; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity
Refractory construction materials, not of metal; roofing, not of metal, incorporating solar cells; non-metallic building boards; wall claddings, not of metal, for building; wall linings, not of metal, for building; roofing tiles, not of metal; buildings, not of metal; building glass
Production of energy; generation of electricity from solar energy; generation of electricity from wind energy; sandblasting services; metal casting; welding services; decontamination of hazardous materials; water treating; generation of electricity; generation of energy; production of energy by power plants
No 79256798
No Service Mark
No
No
No
No
No
No
No
No
No
Status Date | Action Taken |
---|---|
12th Sep 2020 | FINAL DECISION TRANSACTION PROCESSED BY IB |
04th Sep 2020 | NEW REPRESENTATIVE AT IB RECEIVED |
18th Aug 2020 | FINAL DISPOSITION NOTICE SENT TO IB |
18th Aug 2020 | FINAL DISPOSITION PROCESSED |
14th Jul 2020 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
14th Apr 2020 | REGISTERED-PRINCIPAL REGISTER |
28th Jan 2020 | PUBLISHED FOR OPPOSITION |
24th Jan 2020 | NOTIFICATION PROCESSED BY IB |
08th Jan 2020 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
08th Jan 2020 | NOTICE OF PUBLICATION |