on 01 Apr 2022
Last Applicant/ Owned by
9# Keyan Rd., High-Tech park Mid-Area
Nanshan District, Shenzhen
CN
Serial Number
79159005 filed on 25th Sep 2014
Registration Number
4810669 registered on 15th Sep 2015
Correspondent Address
Gregory M. Krakau
Filing Basis
No Filing Basis
Disclaimer
NO DATA
Data processing apparatus; data processing equipment, namely, couplers; pedometers; scales; automatic getter software for interfacing computer networks with control and data acquisition systems; radios; vehicle radios; electro-dynamic apparatus for the remote control of signals; global positioning system GPS apparatus; network communication equipment, namely, hubs, switches and routers; electric i Read More
Data processing apparatus; data processing equipment, namely, couplers; pedometers; scales; automatic getter software for interfacing computer networks with control and data acquisition systems; radios; vehicle radios; electro-dynamic apparatus for the remote control of signals; global positioning system GPS apparatus; network communication equipment, namely, hubs, switches and routers; electric installations for the remote control of industrial operations; power station automation equipment, namely, computers, computer hardware and computer peripherals
No 79159005
No Service/Collective Mark
No SCIHEAD.0002
No
No
No
No
No
No
No
No
01.15.24 -
Sound waves, including designs depicting sound
24.19.04 -
Symbols for mobile internet, radio, or wireless communications, service, and signal strength
26.01.21 -
Circles that are totally or partially shaded
26.17.09 -
Curved line(s), band(s) or bar(s)
27.03.01 -
Geometric figures forming letters or numerals, including punctuation
Status Date | Action Taken |
---|---|
27th Feb 2023 | TOTAL INVALIDATION PROCESSED BY THE IB |
20th Jan 2023 | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
20th Jan 2023 | INVALIDATION PROCESSED |
01st Dec 2022 | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED |
01st Apr 2022 | CANCELLED SECTION 71 |
15th Sep 2020 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |
17th Jun 2016 | FINAL DECISION TRANSACTION PROCESSED BY IB |
22nd Mar 2016 | FINAL DISPOSITION NOTICE SENT TO IB |
22nd Mar 2016 | FINAL DISPOSITION PROCESSED |
15th Dec 2015 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |