tm logo
GP-COOL SPEED
Dead/Cancelled
CANCELLED – SECTION 71

on 05 Jul 2024

Last Applicant/ Owned by

Serial Number

79202973 filed on 08th Nov 2016

Registration Number

5357170 registered on 19th Dec 2017

in the Principal Register

Correspondent Address

Miriam D. Trudell

Miriam D. Trudell Sheridan Ross P.C.

Denver, CO 80202

UNITED STATES

Filing Basis

1. filing basis filed as 66 a

Disclaimer

NO DATA

GP-COOL SPEED

Cooling and heating ceiling systems used for indoor cooling and heating purposes, namely, air-cooling apparatus and instruments and heating installations; cooling and heating systems for fastening to ceilings; coils as parts of cooling and heating ceiling systems, namely, air-cooling apparatus and instruments and heating installations Metal ducts, pipes and tubes and fittings therefor for cooling Read More

Classification Information


Class [019]
Non-Metallic Building Material Products


Non-metal ducts and pipes and accessories therefor for cooling and heating ceiling systems, namely, air-cooling apparatus and instruments and heating installations; non-metallic and non-electric duct installations for cooling and heating ceiling systems, namely, air-cooling apparatus and instruments and heating installations; non-electric ducting conduit installations of non-metallic materials for cooling and heating ceiling systems; rigid pipes, not of metal for buildings; ducts for cooling and heating ceiling systems, not of metal; building materials, namely plastic pipes and plastic conduits; plastic pipes for cooling and heating ceiling systems; panel mouldings of non-metallic materials; non-metal ceiling panels; ceiling panels, in particular of gypsum; mastics, namely, adhesive or filler building material; ceiling panels of gypsum


First Use Date in General

N/A

First Use Date in Commerce

N/A

Class [017]
Rubber Products


Non-metal hoses for cooling and heating ceiling systems


First Use Date in General

N/A

First Use Date in Commerce

N/A

Class [011]
Environmental Control Instrument Products (lighting,heating,cooling,cooking)


Cooling and heating ceiling systems used for indoor cooling and heating purposes, namely, air-cooling apparatus and instruments and heating installations; cooling and heating systems for fastening to ceilings; coils as parts of cooling and heating ceiling systems, namely, air-cooling apparatus and instruments and heating installations


First Use Date in General

N/A

First Use Date in Commerce

N/A

Class [006]
Metal Products


Metal ducts, pipes and tubes and fittings therefor for cooling and heating ceiling systems, namely, air-cooling apparatus and instruments and heating installations; fastening rails of metal for cooling and heating ceiling systems, namely, air-cooling apparatus and instruments and heating installations; fastening rails of metal for affixing of cooling and heating ceiling systems; retaining fixing devices of metal for cooling and heating ceiling systems; fixing devices of metal for cooling and heating ceiling systems, namely, air-cooling apparatus and instruments and heating installations; fastening parts of metal for insertion of pipes; cam buckle tighteners of metal; metal clips for general use; vice claws; clips of metal for tubes; girders of metal; profile strips of metal; mouldings of metal for use in building; mouldings of metal for insertion of pipes or hoses; metal ceiling panels


First Use Date in General

N/A

First Use Date in Commerce

N/A

Mark Details


Serial Number

No 79202973

Mark Type

No Service/Collective Mark

Attorney Docket Number

No 2584BMG-1

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

Yes

66A Current

Yes

Current Basis

No

No Basis

No

Legal History


Show more

Status DateAction Taken
05th Jul 2024CANCELLED SECTION 71
15th Apr 2023NEW REPRESENTATIVE AT IB RECEIVED
19th Dec 2022COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
30th Aug 2018NEW REPRESENTATIVE AT IB RECEIVED
19th May 2018FINAL DECISION TRANSACTION PROCESSED BY IB
29th Mar 2018FINAL DISPOSITION NOTICE SENT TO IB
28th Mar 2018FINAL DISPOSITION PROCESSED
19th Mar 2018FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
19th Dec 2017REGISTERED-PRINCIPAL REGISTER
03rd Oct 2017OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED