tm logo
FSP
Live/Registered
REGISTERED

on 19 Nov 2024

Last Applicant/ Owned by

Serial Number

97591553 filed on 14th Sep 2022

Registration Number

7573132 registered on 19th Nov 2024

in the Principal Register

Correspondent Address

Steven J. Sinclair, Jr.

Steven J. Sinclair, Jr. Fletcher Yoder, P.C.

Houston, TX 77070

United States

Filing Basis

1. intent to use

2. use application currently

Disclaimer

NO DATA

FSP

Engineering and industrial design services, namely, design of pipes for others; pipeline services, namely, testing the functionality and integrity of apparatus and instruments in the nature of oil, gas, natural gas, fuel, water, waste water, chemical, slurry, electrical and telecommunication pipelines Pipe deployment services, namely, pipe laying for others; operating pipe deployment systems, nam Read More

Classification Information


Class [042]
Computer & Software Services & Scientific Services


Engineering and industrial design services, namely, design of pipes for others; pipeline services, namely, testing the functionality and integrity of apparatus and instruments in the nature of oil, gas, natural gas, fuel, water, waste water, chemical, slurry, electrical and telecommunication pipelines


First Use Date in General

06th Mar 2024

First Use Date in Commerce

06th Mar 2024

Class [037]
Construction and Repair Services


Pipe deployment services, namely, pipe laying for others; operating pipe deployment systems, namely, pipe laying services using pipe laying equipment to install pipe for others; pipeline maintenance and construction, namely, installation, operation and maintenance of steel pipes and steel deployment systems


First Use Date in General

06th Mar 2024

First Use Date in Commerce

06th Mar 2024

Mark Details


Serial Number

No 97591553

Mark Type

No Service Mark

Attorney Docket Number

No

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

No

66A Current

No

Current Basis

No

No Basis

No

Legal History


Show more

Status DateAction Taken
19th Nov 2024NOTICE OF REGISTRATION CONFIRMATION EMAILED
19th Nov 2024REGISTERED-PRINCIPAL REGISTER
30th Oct 2024AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
12th Oct 2024ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
12th Oct 2024NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
06th Sep 2024CASE ASSIGNED TO INTENT TO USE PARALEGAL
06th Sep 2024STATEMENT OF USE PROCESSING COMPLETE
08th Jul 2024TEAS STATEMENT OF USE RECEIVED
08th Jul 2024USE AMENDMENT FILED
09th Jan 2024NOA E-MAILED - SOU REQUIRED FROM APPLICANT