on 25 Jul 2023
Last Applicant/ Owned by
A-4942 Gurten
AT
Serial Number
79349185 filed on 18th May 2022
Registration Number
7117426 registered on 25th Jul 2023
Filing Basis
1. filing basis filed as 66 a
Disclaimer
NO DATA
Scientific and technological services, namely, research and design relating thereto in the field of metalworking, woodworking and plastics processing; industrial analysis and research services, namely, analyzing technology requirements in the field of metalworking, woodworking and plastics processing; design and development of computer hardware and computer software; engineering services; engineer Read More
Scientific and technological services, namely, research and design relating thereto in the field of metalworking, woodworking and plastics processing; industrial analysis and research services, namely, analyzing technology requirements in the field of metalworking, woodworking and plastics processing; design and development of computer hardware and computer software; engineering services; engineering services, namely, preparation of engineering drawings; technical project studies in the field of metalworking, woodworking and plastics processing
Woodworking; custom assembling of materials for others, namely, assembly of metalworking machines, woodworking machines, casting machines and plastics processing machines; metal casting
Building construction; machinery installation, maintenance and repair
Downloadable software for controlling machines; downloadable computer software for quality control; electronic control systems for machines
Machine tools for forming, riveting, swaging, and flaring of metal and plastics; foundry machines being casting machines; metalworking machines; woodworking machine, namely, bandsaws, presses, machines for repairing defects in wood, conveyors, transportation; machines for processing plastics; industrial robots; machinery for manufacturing components of composite materials
No 79349185
No Service Mark
No 038709
No
No
No
No
Yes
Yes
No
No
Status Date | Action Taken |
---|---|
21st Nov 2023 | FINAL DECISION TRANSACTION PROCESSED BY IB |
26th Oct 2023 | FINAL DISPOSITION PROCESSED |
26th Oct 2023 | FINAL DISPOSITION NOTICE SENT TO IB |
25th Oct 2023 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
25th Jul 2023 | REGISTERED-PRINCIPAL REGISTER |
25th Jul 2023 | NOTICE OF REGISTRATION CONFIRMATION EMAILED |
17th May 2023 | NOTIFICATION PROCESSED BY IB |
09th May 2023 | PUBLISHED FOR OPPOSITION |
09th May 2023 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
26th Apr 2023 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |