tm logo
ENDU-BOARD
Live/Registered
REGISTERED

on 27 Aug 2024

Last Applicant/ Owned by

991 US 22 West Suite 200

Bridgewater

NJ

08807

Serial Number

97655423 filed on 31st Oct 2022

Registration Number

7489818 registered on 27th Aug 2024

in the Principal Register

Correspondent Address

Richard Sampson

Richard Sampson DAVIS, MALM & D'AGOSTINE, P.C.

BOSTON, MA 02108

UNITED STATES

Filing Basis

1. intent to use

2. use application currently

Disclaimer

NO DATA

ENDU-BOARD

Building materials, namely, composite panels composed primarily of nonmetal materials; building materials, namely, manufactured water-resistant concrete, plastic, and PVC veneer for use on interior walls in basements and other flood-prone surface areas; non-metal building materials, namely, a water-resistant interior wall finishing system using cement, plastic, and PVC boards and trim components

Classification Information


Class [019]
Non-Metallic Building Material Products


Building materials, namely, composite panels composed primarily of nonmetal materials; building materials, namely, manufactured water-resistant concrete, plastic, and PVC veneer for use on interior walls in basements and other flood-prone surface areas; non-metal building materials, namely, a water-resistant interior wall finishing system using cement, plastic, and PVC boards and trim components


First Use Date in General

01st Apr 2024

First Use Date in Commerce

01st Apr 2024

Mark Details


Serial Number

No 97655423

Mark Type

No Service/Collective Mark

Attorney Docket Number

No 14161008

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

No

66A Current

No

Current Basis

No

No Basis

No

Legal History


Show more

Status DateAction Taken
27th Aug 2024NOTICE OF REGISTRATION CONFIRMATION EMAILED
27th Aug 2024REGISTERED-PRINCIPAL REGISTER
20th Jul 2024ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
20th Jul 2024NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
22nd Jun 2024CASE ASSIGNED TO INTENT TO USE PARALEGAL
22nd Jun 2024STATEMENT OF USE PROCESSING COMPLETE
16th May 2024NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
15th May 2024SOU EXTENSION 1 GRANTED
15th May 2024SOU EXTENSION 1 FILED
15th May 2024SOU TEAS EXTENSION RECEIVED