tm logo
EDGEVIEW SCREENED RAIL SYSTEMS
Live/Registered
REGISTERED

on 12 Sep 2023

Last Applicant/ Owned by

28360 OLD 41 ROAD, STE. 4

Bonita Springs

US

FL

34135

Serial Number

97420115 filed on 19th May 2022

Registration Number

7166068 registered on 12th Sep 2023

in the Principal Register

Correspondent Address

George F. Wallace

George F. Wallace

CAPE CORAL, FL 33991

Filing Basis

1. intent to use

2. use application currently

Disclaimer

NO DATA

EDGEVIEW SCREENED RAIL SYSTEMS

Metal building materials, namely, structural support beams made of metal, metal structural members for screened walls, and fasteners used in the manufacture of sunrooms, patio rooms, porch enclosures, carports, patio covers, screen rooms, swimming pool enclosures; metal building materials, namely, metal screws, metal cable railing, metal cable connectors, and metal wire cable tensioners

Classification Information


Class [006]
Metal Products


Metal building materials, namely, structural support beams made of metal, metal structural members for screened walls, and fasteners used in the manufacture of sunrooms, patio rooms, porch enclosures, carports, patio covers, screen rooms, swimming pool enclosures; metal building materials, namely, metal screws, metal cable railing, metal cable connectors, and metal wire cable tensioners


First Use Date in General

19th May 2022

First Use Date in Commerce

19th May 2022

Mark Details


Serial Number

No 97420115

Mark Type

No Service/Collective Mark

Attorney Docket Number

No BLATAY-TM04

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

No

66A Current

No

Current Basis

No

No Basis

No

Design Code(s)

26.17.01 -

Straight line(s), band(s) or bar(s)

26.17.05 -

Horizontal line(s), band(s) or bar(s)

Legal History


Show more

Status DateAction Taken
12th Sep 2023REGISTERED-PRINCIPAL REGISTER
12th Sep 2023NOTICE OF REGISTRATION CONFIRMATION EMAILED
10th Aug 2023NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
09th Aug 2023CASE ASSIGNED TO INTENT TO USE PARALEGAL
09th Aug 2023STATEMENT OF USE PROCESSING COMPLETE
09th Aug 2023ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
26th Jul 2023TEAS STATEMENT OF USE RECEIVED
26th Jul 2023USE AMENDMENT FILED
06th Jun 2023NOA E-MAILED - SOU REQUIRED FROM APPLICANT
11th Apr 2023PUBLISHED FOR OPPOSITION