mailed
on 14 Nov 2024
Last Applicant/ Owned by
79589 Binzen
DE
Serial Number
79360181 filed on 06th Dec 2022
Registration Number
N/A
Correspondent Address
Marcus P. Dolce
Filing Basis
1. filing basis filed as 66 a
Disclaimer
NO DATA
Construction, namely, supervising, planning and building realization; installation services and repair, in relation to fabrication of pipelines and pipe-fitting; pipe laying; renovation of plumbing; services for the repair of pipes; services for the repair of conduits; servicing of conduits; servicing of pipes; pipeline laying; tube laying; pipe installation services; pipeline maintenance; constru Read More
Construction, namely, supervising, planning and building realization; installation services and repair, in relation to fabrication of pipelines and pipe-fitting; pipe laying; renovation of plumbing; services for the repair of pipes; services for the repair of conduits; servicing of conduits; servicing of pipes; pipeline laying; tube laying; pipe installation services; pipeline maintenance; construction of pipelines; conduit laying; servicing of tubes; installation of pipework systems; installation of industrial piping, especially installation of mechanically rolled pipelines; laying and construction of pipelines; pipeline construction and maintenance; advisory services relating to pipe laying, especially information, in relation to mechanically rolled pipelines; maintenance and repair of pipelines; pipeline installation and repair; maintenance and repair of pipeline systems; maintenance and repair of conduit systems; maintenance and repair of industrial piping; maintenance and repair of pipes used in industrial equipment; installation of pipe systems for conducting of liquids, especially, installation in relation to mechanically rolled pipelines; installation of pipe systems for conducting of steam, especially, installation in relation to mechanically rolled pipelines; assembly of pipelines by connection of the pipes; assembly of pipes by non-welded connection of the pipes
N/A
N/A
Branching pipes of metal for pipelines; metal adaptors for pipes in the nature of pipe elbows, supports, fittings, branches and couplings; pivoting fittings of metal for pipes; collapsible pipes of metal; pipe collars of metal; flanges of metal; flanged pipes of metal; pipes, tubes and hoses, and fittings therefor, and manually operated valves, of metal; metal clamps for pipes; metal pipes and tubes; pipes and tubes of metal; couplings of metal for tubing; couplings of metal for pipelines; couplings of metal for pipes; metal coupling elements for tubing; metal coupling parts for tubing; pipe fittings, namely, junctions of metal; pipe spacers of metal; fittings of metal for pipes; pipe extensions of metal; fitting elements of metal for pipes; pipe bends of metal other than parts of machines; metal tubes for gas; ducts made of metal for trunking conduits for liquids; ducts made of metal for trunking pipes for gases; ducts made of metal for trunking pipes for liquids; metal air conditioning ducts; ducts of metal for concealing water pipes; tubes of stainless steel; metal pipe supports; collars of metal for fastening pipes; elbows of metal for pipes; elbows of metal for pipes including those from alloy steel and titanium; pipework of metal; pipes of metal including those from alloy steel and titanium; metal joint connectors for pipes; junctions of metal for pipes, namely, alloy steel and titanium; pipe muffs of metal; clips of metal for pipes; pipe support sleeves of metal; junctions of metal for pipes; tubes of metal including those from alloy steel and titanium; pipe couplings of metal; connectors of metal for pipes; connectors of metal for pipelines; junctions of metal for pipelines; junctions of metal for tubes; manifolds of metal for pipelines
N/A
N/A
No 79360181
No Service Mark
No 5056.T0158US
No
No
No
No
Yes
Yes
No
No
Status Date | Action Taken |
---|---|
14th Nov 2024 | FINAL REFUSAL E-MAILED |
14th Nov 2024 | NOTIFICATION OF FINAL REFUSAL EMAILED |
14th Nov 2024 | FINAL REFUSAL WRITTEN |
10th Jun 2024 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
09th May 2024 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
09th May 2024 | TEAS/EMAIL CORRESPONDENCE ENTERED |
09th May 2024 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
11th Dec 2023 | REFUSAL PROCESSED BY IB |
20th Nov 2023 | REFUSAL PROCESSED BY MPU |
20th Nov 2023 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |