final action
on 06 Aug 2024
Last Applicant/ Owned by
CH-3600 Thun
CH
Serial Number
79390809 filed on 08th Dec 2023
Registration Number
N/A
Correspondent Address
Filing Basis
1. filing basis filed as 66 a
Disclaimer
NO DATA
Scientific and technological services as well as research and design services relating thereto; industrial analysis, industrial research and industrial design services; quality control and authentication services; technical project planning; construction work planning; architectural services; design of interior decor; technical development of construction projects; construction drafting; engineeri Read More
Scientific and technological services as well as research and design services relating thereto; industrial analysis, industrial research and industrial design services; quality control and authentication services; technical project planning; construction work planning; architectural services; design of interior decor; technical development of construction projects; construction drafting; engineering; engineering work; engineering services in the field of construction technology.
N/A
N/A
Non-metallic construction materials; non-metallic rigid pipes for building; asphalt, pitch, tar and bitumen; transportable buildings not of metal; monuments not of metal; logs (building materials); building lumber; planks of wood for building; wood posts; structural and architectural members formed of pressed wood fibers; moldable wood; partly processed timber; plywood; plywood panels; semi-worked wood; fire resistant wood; manufactured timber; halved timber; multi-layered wood; wood pulp board for building; assembly parts of wood; artificial timber; fiber boards (building materials); hardboard; raw and coated chipboard for the building industry, furniture and interior decorating; refractory construction materials, not of metal; prefabricated joinery products, excluding furniture; modular homes not of metal; prefabricated houses not of metal.
N/A
N/A
No 79390809
No Service Mark
No
No
No
No
No
Yes
Yes
No
No
Status Date | Action Taken |
---|---|
25th Aug 2024 | REFUSAL PROCESSED BY IB |
06th Aug 2024 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
06th Aug 2024 | REFUSAL PROCESSED BY MPU |
18th Jul 2024 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
17th Jul 2024 | NON-FINAL ACTION WRITTEN |
09th Jul 2024 | ASSIGNED TO EXAMINER |
24th Apr 2024 | APPLICATION FILING RECEIPT MAILED |
12th Mar 2024 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
08th Mar 2024 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
07th Mar 2024 | SN ASSIGNED FOR SECT 66A APPL FROM IB |