final action
on 26 Oct 2024
Last Applicant/ Owned by
CIDADE INDUSTRIAL 81460-120 Curitiba
BR
Serial Number
79400878 filed on 03rd Apr 2024
Registration Number
N/A
Correspondent Address
Filing Basis
1. filing basis filed as 66 a
Disclaimer
NO DATA
Installation and maintenance services of electrical conductor cables, telephone cables or communication and network cables; installation and maintenance services of electrical and electronic equipment and devices. Telecommunications cables; phase cables; lightning conductors cables; connectorized telecommunications cables; transmission line cables including electric cables with optical fiber core Read More
Installation and maintenance services of electrical conductor cables, telephone cables or communication and network cables; installation and maintenance services of electrical and electronic equipment and devices.
N/A
N/A
Telecommunications cables; phase cables; lightning conductors cables; connectorized telecommunications cables; transmission line cables including electric cables with optical fiber cores; optical fiber connectors; accessories for cable installation, including but not limited to: transmitters [telecommunications], transmitters of electronic signals, telephone transmitters, transponders, couplers [data processing equipment]; optical data media; accessories for cable installation, including but not limited to: electrical sockets, electrical plugs, and other electrical contacts [couplings, electric]; electrical distribution boxes [electricity]; electrical contacts; electric switchboards; distribution boards [electricity]; distribution consoles [electricity]; junction sleeves for electric cables; data center accessories included in this class; cables and accessories included in this class for structured cabling; radio accessories included in this class; video cameras; antennas; optical sensors included in this class.
N/A
N/A
No 79400878
No Service Mark
No
No
No
No
No
Yes
Yes
No
No
Status Date | Action Taken |
---|---|
17th Nov 2024 | REFUSAL PROCESSED BY IB |
26th Oct 2024 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
26th Oct 2024 | REFUSAL PROCESSED BY MPU |
22nd Oct 2024 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
21st Oct 2024 | NON-FINAL ACTION WRITTEN |
16th Oct 2024 | ASSIGNED TO EXAMINER |
30th Jul 2024 | APPLICATION FILING RECEIPT MAILED |
30th Jul 2024 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
25th Jul 2024 | SN ASSIGNED FOR SECT 66A APPL FROM IB |