tm logo
CGW ABRASIVES C
Live/Registered
REGISTERED

on 03 Dec 2019

Last Applicant/ Owned by

7525 N Oak Park Ave

Niles

IL

60714

Serial Number

88128903 filed on 24th Sep 2018

Registration Number

5928115 registered on 03rd Dec 2019

in the Principal Register

Correspondent Address

Deborah J Peckham

DEBORAH J PECKHAM

125 High Street

BOSTON, MA 02110

Filing Basis

1. intent to use

2. use application currently

Disclaimer

NO DATA

CGW ABRASIVES C

Power-operated machine parts and power-operated machine tools used as abrasives, namely, grinding wheels, flap discs for power-operated grinders, abrasive belts for power-operated sanders, abrasive wheels and disks for power-operated grinders and sanders, burs in the nature of rotary cutting tools, wire brushes for use in machines, grinding and cut-off wheels, grinding vitrified bonded wheels, gri Read More

Classification Information


Class [007]
Machinery Products


Power-operated machine parts and power-operated machine tools used as abrasives, namely, grinding wheels, flap discs for power-operated grinders, abrasive belts for power-operated sanders, abrasive wheels and disks for power-operated grinders and sanders, burs in the nature of rotary cutting tools, wire brushes for use in machines, grinding and cut-off wheels, grinding vitrified bonded wheels, grinding resin bonded wheels, and coated abrasives and non-woven abrasives both in the nature of grinding wheels


First Use Date in General

17th Oct 2018

First Use Date in Commerce

17th Oct 2018

Mark Details


Serial Number

No 88128903

Mark Type

No Service/Collective Mark

Attorney Docket Number

No CGW-603

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

No

66A Current

No

Current Basis

No

No Basis

No

Design Code(s)

26.01.21 -

Circles that are totally or partially shaded

26.17.01 -

Straight line(s), band(s) or bar(s)

26.17.06 -

Diagonal line(s), band(s) or bar(s)

Legal History


Show more

Status DateAction Taken
03rd Dec 2019REGISTERED-PRINCIPAL REGISTER
29th Oct 2019NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
28th Oct 2019ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
05th Oct 2019STATEMENT OF USE PROCESSING COMPLETE
05th Oct 2019CASE ASSIGNED TO INTENT TO USE PARALEGAL
16th Sep 2019USE AMENDMENT FILED
16th Sep 2019TEAS STATEMENT OF USE RECEIVED
11th Jul 2019TEAS CHANGE OF CORRESPONDENCE RECEIVED
04th Jun 2019NOA E-MAILED - SOU REQUIRED FROM APPLICANT
09th Apr 2019OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED