on 12 Mar 2019
Last Applicant/ Owned by
19820 N. 7TH AVENUE, STE 120
PHOENIX
AZ
85027
Serial Number
87682400 filed on 13th Nov 2017
Registration Number
5694524 registered on 12th Mar 2019
Correspondent Address
Bradley P. Hartman
Filing Basis
1. filed as use application
2. use application currently
Disclaimer
NO DATA
Construction project management and consultation services related to underground pipeline installations; Construction and installation of underground pipelines, utilities and renewable energy systems; Construction services, namely, planning, laying out and construction of pipelines and structures for the storage and transport of energy, natural gas, oil, electricity, water, aviation fuel, fiber op Read More
Pipe fabrication services, namely, custom manufacture of pipes; Pipe fusing, namely, pipe welding services
01st Jan 2015
01st Jan 2015
Construction project management and consultation services related to underground pipeline installations; Construction and installation of underground pipelines, utilities and renewable energy systems; Construction services, namely, planning, laying out and construction of pipelines and structures for the storage and transport of energy, natural gas, oil, electricity, water, aviation fuel, fiber optic cables, and telecommunication lines; Construction services, namely, industrial fabrication and construction of energy pipelines and storage structures; Trenching services, namely, excavation services; Directional pipe drilling services, namely, installation of pipelines using directional boring method; Pipe laying and installation services; Excavation services; Pipe milling services in the nature of pipeline construction and installation and pavement milling services in the nature of pavement construction and installation; Road surface preparation, namely, road paving services for removing and replacing road pavement materials, road pavement sealing, road pavement stripping and traffic lane painting for roadway overlays and repairs; Installation of pipelines and below ground cable using trenchless technology methods, namely, tunneling, micro- tunneling (MTM), horizontal directional drilling (HDD), directional boring, pipe ramming (PR), pipe jacking (PJ), moling, horizontal auger boring (HAB) and other below ground methods with minimal excavation; Vacuum excavation services; Installation, repair, replacement and maintenance of utilities, namely, utility cables, electricity distribution network hardware, water and gas distribution pipe networks, and sanitary pipe hardware systems; Underground infrastructure construction, namely, trenching in the nature of subsurface excavation and trench construction for new utilities; Restoration in the field of utilities, namely, restoration of utility pipe networks; Replacement of utilities, namely, utility cables, electricity distribution network hardware, water and gas distribution pipe networks, and sanitary pipe hardware and septic systems; Repair of existing utilities, namely, utility cables, electricity distribution network hardware, water and gas distribution pipe networks, and sanitary pipe hardware and septic systems; Construction of roads and underground utilities; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; Consultation services in the field of construction of environmentally-conscious buildings; General construction contracting; Laying and construction of pipelines; Pipeline construction and maintenance; Pipeline construction; Pipe laying services
01st Jan 2015
01st Jan 2015
No 87682400
No Service Mark
No 1383.US01
No
No
No
No
No
No
No
No
Status Date | Action Taken |
---|---|
12th Mar 2024 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED |
09th Dec 2022 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
09th Dec 2022 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
09th Dec 2022 | TEAS CHANGE OF CORRESPONDENCE RECEIVED |
04th Sep 2019 | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP |
12th Mar 2019 | REGISTERED-PRINCIPAL REGISTER |
25th Dec 2018 | PUBLISHED FOR OPPOSITION |
25th Dec 2018 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
05th Dec 2018 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
16th Nov 2018 | ASSIGNED TO LIE |