final action
on 05 Dec 2024
Last Applicant/ Owned by
68 Gracefield Road
Lower Hutt
NZ
5010
Serial Number
79390885 filed on 04th Oct 2023
Registration Number
N/A
Correspondent Address
Charles R Halloran
Filing Basis
1. filing basis filed as 66 a
Disclaimer
NO DATA
Research in the field of energy production and use; research in the field of materials science; research in the fields of materials science and electrical engineering; research in the field of engineering; engineering research; scientific analysis in the field of fuel cells and hydrogen generators; technological research in the field of energy production and use; scientific research in the field o Read More
Research in the field of energy production and use; research in the field of materials science; research in the fields of materials science and electrical engineering; research in the field of engineering; engineering research; scientific analysis in the field of fuel cells and hydrogen generators; technological research in the field of energy production and use; scientific research in the field of renewable energy; research in the field of physics; engineering studies, namely, conducting feasibility studies in the field of energy production and use; industrial analysis and research services relating to fuel cells and hydrogen generators; scientific and technological services, namely, research and design in the fields of energy production and use, fuel cells and hydrogen production; research and development and testing services in the field of hydrogen power and hydrogen powered products and consultation related thereto; designing and testing of fuel cell systems; designing and testing of hydrogen generators; providing technological information, advisory and consultancy services in the technology field of alternative energy generation and use; materials testing; testing hydrogen generators and fuel cells and components thereof; testing of raw materials; materials testing and analysing; materials testing, analysis and scientific evaluation; testing of anti-corrosion materials; testing of non-combustible materials; testing of heat insulating materials; testing of heat retaining materials; materials testing for fault detection; hydrogen generator and fuel cell testing services
N/A
N/A
Electrolysers; electrolytic fuel cells; electrodes, membranes and cell stacks specifically adapted for electrolysers; fuel cell electrodes having electrocatalytic properties; catalyst-coated electrodes forming a single homogenous part; electrodes and fuel cell membranes forming a single homogenous part; electrochemical measuring instruments and apparatus; electrochemical fuel cells; fuel cells; hydrogen fuel cells; fuel cell electrodes; fuel cell membranes; fuel cell stacks; ion beam sputtering apparatus, namely ion beam sputtering apparatus for sputtering metals; electrolysis apparatus for laboratory use; electrolysis devices for laboratory use
N/A
N/A
Particle deposition machines; ion beam implanting machines; electron beam-induced deposition machines; ion beam-assisted deposition machines; nanoparticle deposition machines; machines for generating gas by electrolysis; machines for generating hydrogen and oxygen by electrolysis; structural and replacement components for machines for generating gas by electrolysis including electrodes, membranes and cell stacks; electric power generators; fuel cell electric power generators; hydrogen and fuel cell electric power generation systems; structural and replacement components for hydrogen and fuel cell electric power generators
N/A
N/A
No 79390885
No Service Mark
No B68-09823
No
No
No
No
Yes
Yes
No
No
Status Date | Action Taken |
---|---|
05th Dec 2024 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
05th Dec 2024 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
05th Dec 2024 | TEAS/EMAIL CORRESPONDENCE ENTERED |
15th Jul 2024 | REFUSAL PROCESSED BY IB |
27th Jun 2024 | REFUSAL PROCESSED BY MPU |
27th Jun 2024 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
14th Jun 2024 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
05th Jun 2024 | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED |
03rd Jun 2024 | NON-FINAL ACTION WRITTEN |
23rd May 2024 | ASSIGNED TO EXAMINER |