on 18 Jun 2024
Last Applicant/ Owned by
Building G, Floor 4, J582
Beijing
CN
100083
Serial Number
97286906 filed on 28th Feb 2022
Registration Number
7422685 registered on 18th Jun 2024
Filing Basis
1. intent to use
2. use application currently
Disclaimer
NO DATA
Providing temporary use of non-downloadable cloud based computer aided design and manufacturing software (CAD/CAM) for use in construction, building, modeling, simulation, architecture, engineering, testing analysis performance, configuration, sustainable design and automated manufacturing; Providing temporary use of non-downloadable cloud based computer software for modeling and structural reinfo Read More
Providing temporary use of non-downloadable cloud based computer aided design and manufacturing software (CAD/CAM) for use in construction, building, modeling, simulation, architecture, engineering, testing analysis performance, configuration, sustainable design and automated manufacturing; Providing temporary use of non-downloadable cloud based computer software for modeling and structural reinforcement; providing virtual computer systems and virtual computer environments through cloud computing; Providing temporary use of non-downloadable cloud based software development and exchange tools; design of information graphics and data visualization materials; providing an internet website portal offering information in the field of computer aided design and manufacturing; Providing temporary use of non-downloadable, cloud based computer software for generating and managing physical and functional characteristics of the building process; Design and development of non-downloadable computer software for use in computer-aided design, computer-aided engineering, computer-aided manufacturing, and visualization
01st Jul 2022
01st Jul 2022
No 97286906
No Service Mark
No 10102400001
No
No
No
No
No
No
No
No
Status Date | Action Taken |
---|---|
18th Jun 2024 | NOTICE OF REGISTRATION CONFIRMATION EMAILED |
18th Jun 2024 | REGISTERED-PRINCIPAL REGISTER |
15th May 2024 | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED |
15th May 2024 | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED |
22nd Apr 2024 | STATEMENT OF USE PROCESSING COMPLETE |
18th Apr 2024 | TEAS STATEMENT OF USE RECEIVED |
18th Apr 2024 | USE AMENDMENT FILED |
16th Apr 2024 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
07th Mar 2024 | NEW NOA TO ISSUE |
07th Mar 2024 | CASE ASSIGNED TO INTENT TO USE PARALEGAL |