on 14 Feb 2023
Last Applicant/ Owned by
2321 East 28th Street, Suite # 400
Signal Hill
CA
90755
Serial Number
90533525 filed on 18th Feb 2021
Registration Number
6976678 registered on 14th Feb 2023
Filing Basis
1. use application currently
Disclaimer
NO DATA
Construction of facilities in the biogas to renewable energy field, namely, construction of facilities for storage, production, distribution and transportation of biogas for energy production purposes and construction of facilities for producing electric energy and heat from biogas; Construction site preparation, namely, installation of utilities and processing equipment in construction sites for Read More
Construction of facilities in the biogas to renewable energy field, namely, construction of facilities for storage, production, distribution and transportation of biogas for energy production purposes and construction of facilities for producing electric energy and heat from biogas; Construction site preparation, namely, installation of utilities and processing equipment in construction sites for energy production facilities and for facilities for use in connection with for storage, production, distribution and transportation of biogas for energy production purposes; Construction project management services, namely, construction management and maintenance of facilities for storage, production, distribution and transportation of biogas for energy production purposes in the field of biogas collection and biogas utilization projects; Maintenance and repair of infrastructure and facilities in the biogas-to-energy field; construction site preparation, namely, planning and laying out of utilities for energy production facilities; construction consulting in the biogas to renewable energy field, namely, consulting in the field of construction of biogas to renewable energy field facilities which store, produce, distribute and transport biogas for energy production purposes; consulting in the field of construction of biogas to renewable energy facilities for producing electric energy and heat from biogas
07th Mar 2016
07th Mar 2016
Engineering design, namely, civil and mechanical engineering design in the biogas to renewable energy field, namely, civil and mechanical engineering design in the fields of constructing energy production facilities and biogas storage, production, distribution and transportation facilities; Engineering design, namely, civil and mechanical engineering design in the fields of cleanup and treatment system design, facility design, collection and control system design, methane mitigation system design, foundation and building design, landfill cell and sequencing design, and hydrological modeling in the biogas to renewable energy field
07th Mar 2016
07th Mar 2016
No 90533525
No Service Mark
No 3-00104
No
No
No
No
No
No
No
No
26.11.02 -
Plain single line rectangles
Status Date | Action Taken |
---|---|
14th Feb 2023 | NOTICE OF REGISTRATION CONFIRMATION EMAILED |
14th Feb 2023 | REGISTERED-PRINCIPAL REGISTER |
29th Nov 2022 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
29th Nov 2022 | PUBLISHED FOR OPPOSITION |
09th Nov 2022 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
27th Oct 2022 | APPROVED FOR PUB - PRINCIPAL REGISTER |
26th Oct 2022 | TEAS/EMAIL CORRESPONDENCE ENTERED |
25th Oct 2022 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
25th Oct 2022 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
26th Apr 2022 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |