tm logo
ASTA POWERPROJECT
Live/Registered
SECTION 71 ACCEPTED

on 08 Dec 2023

Last Applicant/ Owned by

London EC2A 4HB

GB

Serial Number

79177121 filed on 23rd Sep 2015

Registration Number

5303690 registered on 10th Oct 2017

in the Principal Register

Correspondent Address

Feng Shan

Feng Shan

1629 K Street NW, Suite 300

Washington DC 20006

Filing Basis

1. filing basis filed as 66 a

Disclaimer

NO DATA

ASTA POWERPROJECT

Software support and technical support services, namely, troubleshooting of computer software problems; scientific, engineering and industrial research and development and consultancy in the fields of computer-aided design, computer generated two-dimensional and three-dimensional visualizations, computer project management, construction drafting and architecture; installation, repair and maintenan Read More

Classification Information


Class [042]
Computer & Software Services & Scientific Services


Software support and technical support services, namely, troubleshooting of computer software problems; scientific, engineering and industrial research and development and consultancy in the fields of computer-aided design, computer generated two-dimensional and three-dimensional visualizations, computer project management, construction drafting and architecture; installation, repair and maintenance of computer programs and computer software; consultancy and help desk services in relation to the installation, development, use and application of software and computer programs

Class [016]
Paper Goods and Printed Material


Printed matter, namely, brochures and leaflets in the fields of building construction, engineering project management, and architectural design; printed publications, namely, written articles and manuals in the fields of building construction, engineering project management and architectural design; printed instructional and teaching material except apparatus in the fields of building construction, engineering project management and architectural design

Class [009]
Computer & Software Products & Electrical & Scientific Products


Computer software for computer aided design for construction project management, for two-dimensional and three-dimensional visualizations, exterior and interior design, product marketing, cost estimation and pricing, project management, worksite management and construction asset management, and for designing and controlling the manufacture of structural building components; computer software for collaboration, workflow management and for simulation use in the engineering and construction industry; project management software; construction portfolio management software; construction materials and financial resources management software; visualization and modeling software for computer-aided design for architectural plans; simulation and design software for creating construction project plans, architectural plans, and workflow documents; downloadable electronic publications in the nature of newsletters, instructional material, and brochures in the fields of computer-aided design, construction and architecture; electronic publications, namely, program documents, operating manuals and user manuals in the fields of computer-aided design, construction and architecture, all recorded on computer media

Mark Details


Serial Number

No 79177121

Mark Type

No Service Mark

Attorney Docket Number

No 30005.0057

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

Yes

66A Current

Yes

Current Basis

No

No Basis

No

Legal History


Show more

Status DateAction Taken
08th Dec 2023REGISTERED-SEC.71 ACCEPTED
08th Dec 2023NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
06th Dec 2023CASE ASSIGNED TO POST REGISTRATION PARALEGAL
24th Apr 2023TEAS SECTION 71 RECEIVED
24th Apr 2023TEAS CHANGE OF OWNER ADDRESS RECEIVED
24th Apr 2023TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
24th Apr 2023ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
24th Apr 2023TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS
24th Apr 2023TEAS CHANGE OF CORRESPONDENCE RECEIVED
24th Apr 2023APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED