on 21 Nov 2023
Last Applicant/ Owned by
Xianlie Road Central, Yuexiu District
Guangzhou Guangdong
CN
Serial Number
79354409 filed on 08th Jul 2022
Registration Number
7220691 registered on 21st Nov 2023
Correspondent Address
Joe McKinney Muncy
Filing Basis
1. filing basis filed as 66 a
Disclaimer
NO DATA
Centrifugal pumps; pumps being parts of machines, engines or motors; pumps for counter-current swimming; speed governors for machines, engines and motors; thermostatic control valves for machines, engines or motors, engines or motors; water power dynamical facility, namely, water pumps for swimming pools; rinsing machines; lawnmowers being machines; pumps for machines; fuel injection pumps; compre Read More
Centrifugal pumps; pumps being parts of machines, engines or motors; pumps for counter-current swimming; speed governors for machines, engines and motors; thermostatic control valves for machines, engines or motors, engines or motors; water power dynamical facility, namely, water pumps for swimming pools; rinsing machines; lawnmowers being machines; pumps for machines; fuel injection pumps; compressed air pumps; machine wheels; brushes, electrically operated, being parts of machines; machine belts; parallel belts for machines in the nature of transport belts, conveyor belts, excluding land vehicle engine drive belts; belt pulleys being parts of machines; heat exchangers being parts of machines; electric washing machines and apparatus for cleaning for industrial purposes; washing apparatus, namely, machines for cleaning swimming pools; electric washing machines for industrial purposes; vacuum cleaners for industrial purposes; snow ploughs; cordless vacuum cleaners; pool cleaning machines being swimming pool vacuum cleaners; dust exhausting installations for cleaning purposes; steam mops, electric
No 79354409
No Service/Collective Mark
No DF230700056
No
No
No
No
Yes
Yes
No
No
26.17.02 -
Wavy line(s), band(s) or bar(s)
26.17.05 -
Horizontal line(s), band(s) or bar(s)
Status Date | Action Taken |
---|---|
18th Mar 2024 | FINAL DECISION TRANSACTION PROCESSED BY IB |
26th Feb 2024 | FINAL DISPOSITION PROCESSED |
26th Feb 2024 | FINAL DISPOSITION NOTICE SENT TO IB |
21st Feb 2024 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
21st Nov 2023 | REGISTERED-PRINCIPAL REGISTER |
21st Nov 2023 | NOTICE OF REGISTRATION CONFIRMATION EMAILED |
05th Sep 2023 | PUBLISHED FOR OPPOSITION |
05th Sep 2023 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
04th Sep 2023 | NOTIFICATION PROCESSED BY IB |
16th Aug 2023 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |