failure to respond or late response
on 06 Sep 2023
Last Applicant/ Owned by
Rua José Storani, 75 - Conj. 204.
Jundiaí - SP
BR
13209-081
Serial Number
97437936 filed on 01st Jun 2022
Registration Number
N/A
Correspondent Address
Christopher J. Maier
Filing Basis
1. filed as use application
2. use application currently
Disclaimer
NO DATA
Mineral acids; chemical stabilizing additives for food for industrial use; chemical additives for fungicides; compound fertilizer; algae fertilizers; amino acids for industrial use; hexagonal mineral, calcium fluorophosphate or chlorophosphate or both in mixture, namely, apatite, raw material for the manufacture of phosphate fertilizer; Carbonates; organic compound intended for fertilization; fert Read More
Mineral acids; chemical stabilizing additives for food for industrial use; chemical additives for fungicides; compound fertilizer; algae fertilizers; amino acids for industrial use; hexagonal mineral, calcium fluorophosphate or chlorophosphate or both in mixture, namely, apatite, raw material for the manufacture of phosphate fertilizer; Carbonates; organic compound intended for fertilization; fertilizers; nitrogen fertilizers; phosphate fertilizers; stabilizing phosphates for food; filter material consisting of mineral substances; fertilizer preparations; vitamins for the food industry; vitamins for use in the manufacture of food supplements
01st Nov 2011
23rd Oct 2020
No 97437936
No Service/Collective Mark
No 08930111TM
No
No
No
No
No
No
No
No
24.15.01 -
Arrows forming a circle or an arc of a circle
26.01.09 -
Geometric figures, objects, humans, plants or animals forming or bordering the perimeter of a circle
26.01.11 -
Letters, numerals, punctuation, geometric figures, objects, humans, plants or animals comprising a circle
26.17.02 -
Wavy line(s), band(s) or bar(s)
26.17.05 -
Horizontal line(s), band(s) or bar(s)
Status Date | Action Taken |
---|---|
06th Sep 2023 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
06th Sep 2023 | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND |
30th Aug 2023 | ASSIGNED TO EXAMINER |
30th Mar 2023 | NON-FINAL ACTION WRITTEN |
30th Mar 2023 | NON-FINAL ACTION E-MAILED |
30th Mar 2023 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
17th Mar 2023 | ASSIGNED TO EXAMINER |
09th Jun 2022 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
08th Jun 2022 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
04th Jun 2022 | NEW APPLICATION ENTERED |