on 28 Jul 2023
Last Applicant/ Owned by
Dübendorf CH-8600
Serial Number
79163494 filed on 19th Dec 2014
Registration Number
5121505 registered on 17th Jan 2017
Correspondent Address
Michelle P. Ciotola
Filing Basis
1. filing basis filed as 66 a
Disclaimer
NO DATA
Engineering in the field of windmills and wind power and development of such projects; Technical assistance in the field of windmills and wind power and development of such projects in the nature of technical support services, namely, troubleshooting of industrial process control computer software problems; development and testing for others of windmills, wind power plants, wind turbines, wind-ope Read More
Engineering in the field of windmills and wind power and development of such projects; Technical assistance in the field of windmills and wind power and development of such projects in the nature of technical support services, namely, troubleshooting of industrial process control computer software problems; development and testing for others of windmills, wind power plants, wind turbines, wind-operated machines, and components thereof; technical research projects for others in the field of windmills, wind power plants, wind turbines and other wind-operated machines; advisory and information services concerning the above-mentioned services
N/A
N/A
Construction, installation, maintenance, servicing and repair of windmills, wind power plants, wind turbines and other wind-operated machines; advisory and information services concerning the above-mentioned services
N/A
N/A
Electronic and computer equipment for windmills, wind power plants, wind turbines and wind-operated machines as well as generators and energy storage units, namely, electronic control systems for machines, computer hardware; energy storage units, namely, power supplies; Control and monitoring equipment, including devices for automatic shut-off and starting of generators and automatic start after a power outage, namely, control units for regulating start-up electrical motors; Automated process control system comprised of logic based hardware used to monitor the status of industrial machinery, namely, turbines, generators and compressors, namely, control and monitoring equipment, including devices for automatic shut-off and starting of generators and automatic start after a power outage; lighting conductors; Microprocessors for controlling and monitoring constant voltage, frequency, phase conditions, rotor speed, monitoring of the performance and thickness of brake linings, temperature, wind direction and wind speed, watt-hour meters
N/A
N/A
Apparatus for wind-power installations, namely, generators for wind turbines, windmills, wind power plants in the nature of windmills, wind turbines and other wind-powered machines in the nature of wind-powered electricity generators; Parts and accessories for the above-mentioned goods, namely, rotor blades for wind turbines, blade roots as parts of wind turbines, wind turbine housings, rotation devices in the nature of turntables and their rotating devices, rotary bearings and transmissions for wind turbines; Machine parts in the nature of wing angle adjustment devices for wind turbines, namely, rotor blade angle adjustment; Machine parts, namely, brakes and braking devices in the nature of disc brakes, brake linings; Main shafts, namely, CAM shafts, Machine parts, namely, constant velocity joints, clutches and electric generators
N/A
N/A
No 79163494
No Service Mark
No REL0005TUS
No
No
No
No
Yes
Yes
No
No
26.01.05 -
Circles made of broken or dotted lines
26.01.17 -
Two concentric circles
Status Date | Action Taken |
---|---|
08th Nov 2024 | CHANGE OF NAME/ADDRESS REC'D FROM IB |
06th May 2024 | TOTAL INVALIDATION PROCESSED BY THE IB |
11th Apr 2024 | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB |
10th Apr 2024 | INVALIDATION PROCESSED |
28th Mar 2024 | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED |
28th Jul 2023 | CANCELLED SECTION 71 |
17th Jan 2022 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED |
25th Jan 2018 | NEW REPRESENTATIVE AT IB RECEIVED |
28th Jul 2017 | NEW REPRESENTATIVE AT IB RECEIVED |
05th May 2017 | FINAL DECISION TRANSACTION PROCESSED BY IB |