non
on 27 Sep 2024
Last Applicant/ Owned by
101 Canary Lane
Grand Junction
CO
81507
Serial Number
98000630 filed on 17th May 2023
Registration Number
N/A
Correspondent Address
GRAND JUNCTION, CO 81507
United States
Filing Basis
1. intent to use
2. intent to use current
Disclaimer
NO DATA
Wall-mounted panel units for exhibitions, displays and partitioning; Movable wall partitions; Non-metal hardware, namely, general use wall and ceiling mounts for audio, video or computer equipment; Non-metal profiles for arranging devices on and in walls, ceilings and other surfaces Installation of cavity wall insulation; Rental of portable walls, flooring, windows, doors and paneling Wall cladd Read More
Installation of cavity wall insulation; Rental of portable walls, flooring, windows, doors and paneling
15th May 2023
15th May 2023
Wall-mounted panel units for exhibitions, displays and partitioning; Movable wall partitions; Non-metal hardware, namely, general use wall and ceiling mounts for audio, video or computer equipment; Non-metal profiles for arranging devices on and in walls, ceilings and other surfaces
15th May 2023
15th May 2023
Wall claddings of metal for building; Wall hooks of metal for pipes; Wall panels of metal; Building wall framing made primarily of metal; Building curtain walls made primarily of metal; Galvanized steel clip with molded rubber used to attach drywall to walls or ceilings; Metal curtain walls; Metal fastening anchors; Metal hardware, namely, general use wall and ceiling mounts for audio, video or computer equipment; Metal molds for forming wall stud replacements for building; Metal profiles for arranging devices on and in walls, ceiling and other surfaces; Prefabricated metal walls
15th May 2023
15th May 2023
No 98000630
No Service Mark
No
No
No
No
No
No
No
No
No
Status Date | Action Taken |
---|---|
27th Sep 2024 | SU - NON-FINAL ACTION - WRITTEN |
27th Sep 2024 | NON-FINAL ACTION E-MAILED |
27th Sep 2024 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
03rd Aug 2024 | CASE ASSIGNED TO INTENT TO USE PARALEGAL |
03rd Aug 2024 | STATEMENT OF USE PROCESSING COMPLETE |
16th Jun 2024 | TEAS STATEMENT OF USE RECEIVED |
16th Jun 2024 | USE AMENDMENT FILED |
04th Jun 2024 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
02th Apr 2024 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
02th Apr 2024 | PUBLISHED FOR OPPOSITION |