failure to respond or late response
on 07 Jan 2021
Last Applicant/ Owned by
83308 Trostberg
DE
Serial Number
79285278 filed on 27th Jan 2020
Registration Number
N/A
Correspondent Address
67056 Ludwigshafen am Rhein
Germany
Filing Basis
No Filing Basis
Disclaimer
NO DATA
Building and construction materials and elements, not of metal Scientific and technological services and research and related design services for construction; industrial analysis and research services for construction Chemical preparations for use in industry and construction; chemical additives for concrete; chemical compositions for fire-resistant flammable substances, including wood; adhesiv Read More
Building and construction materials and elements, not of metal
Chemical preparations for use in industry and construction; chemical additives for concrete; chemical compositions for fire-resistant flammable substances, including wood; adhesives for use in industry; preservatives for buildings (except paints and oils); preservatives, dust and water repellent coatings [chemical, other than paints] for concrete; fireproofing preparations
Caulking materials for construction; insulators for construction
Scientific and technological services and research and related design services for construction; industrial analysis and research services for construction
No 79285278
No Service Mark
No
No
No
No
No
No
No
No
No
26.17.01 -
Straight line(s), band(s) or bar(s)
26.17.05 -
Horizontal line(s), band(s) or bar(s)
Status Date | Action Taken |
---|---|
29th Jan 2022 | FINAL DECISION TRANSACTION PROCESSED BY IB |
07th Jan 2022 | FINAL DISPOSITION NOTICE SENT TO IB |
07th Jan 2022 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
08th Nov 2021 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
20th Oct 2021 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
20th Oct 2021 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
07th Jan 2021 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
07th Jan 2021 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
04th Sep 2020 | NEW REPRESENTATIVE AT IB RECEIVED |
18th Jul 2020 | REFUSAL PROCESSED BY IB |