tm logo
Trademark Search
CAPSTONE INFRASTRUCTURE & DESIGN
CAPSTONE INFRASTRUCTURE & DESIGN
FORMALIZED

on 29 Nov 2021

Last Applicant/ Owned by

CAPSTONE INFRASTRUCTURE CORPORATION

RBC Centre155 Wellington Street WestSuite 2930Toronto

ONTARIO

CA

M5V3H1

Serial Number

2150386 filed on 29th Nov 2021

Correspondent Address

INTELLECTUAL PROPERTY GROUPSUITE 4000, COMMERCE COURT WEST199 BAY STREETTORONTO

ONTARIO

CA

M5L1A9

CAPSTONE INFRASTRUCTURE & DESIGN

Vienna Information


26 . 3 . 2

Two triangles, one inside the otherDeux triangles, l'un dans l'autre

26 . 3 . 24

Triangles with dark surfaces or parts of surfacesTriangles avec surface ou partie de la surface foncée

Trademark usage description

operation of power plants and other power generation apparatus and installations for others; providing advice, information and consultancy services in Read More

Classification Information


Class [035]
Operation of power plants and other power generation apparatus and installations for others; providing advice, information and consultancy services in respect of the aforesaid.


Classification kind code

11

Class [037]
Construction, installation, maintenance and repair of power plants, wind farms, wind parks, wind stations, wind turbines, solar installations, hydropower installations, biomass conversion installations, and other power generating apparatus and installations; construction, installation, maintenance and repair of gas turbines and other apparatus and installations for natural gas extraction; natural gas extraction; providing advice, information and consultancy services in respect of the aforesaid.


Classification kind code

11

Class [040]
Generation and production of power; generation and production of electrical power from renewable sources; processing of natural gas; processing of biomass; biomass gasification; providing advice, information and consultancy services in respect of the aforesaid.


Classification kind code

11

Mark Details


Serial Number

2150386

Mark Type

Trademark

Legal History


Action TakenStatus
Submitted for opposition 287
on 12th Jul 2022
Pre-Assessment Letter Sent
Submitted for opposition 30
on 29th Nov 2021
Filed
Submitted for opposition 1
on 29th Nov 2021
Created
Submitted for opposition 31
on 29th Nov 2021
Formalized